Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Top Deck Replacement (Sheet 2 of 4)
Up
TM-9-2350-222-20-1-5 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
INSTALLATION-continued

TM 9-2350-222-20-1-5
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 3 of 9)
Top Deck Replacement (Sheet 3 of 4)
8.
Install lifting hook of hoist to middle eye
of sling (Item 31, Chapter 3, Section I).
9.
Using hoist, position sling with its `T'
toward front of vehicle.
10. Guide sling over top deck.
11. Connect four hooks of sling to four lifting
handles of top deck.
12.
Lift top deck off vehicle. Put top deck
down in working area.
INSTALLATION:
1.
Using hoist with sling (Item 31, Chapter 3,
Section I), lift top deck (A) into position
over powerplant. `T' of sling should be
toward front of vehicle.
2.
Lower top deck into mounting position.
Go on to Sheet 4

Privacy Statement - Press Release - Copyright Information. - Contact Us