| ||||||||||
|
|
![]() ![]() TM 9-2350-222-20-1-5
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 1 of 9)
SUBTASK INDEX
PAGE
PROCEDURE
Top Deck Replacement
Top Deck Door Panels Replacement
Top Deck Insulator Panel Replacement
Top Deck Replacement (Sheet 1 of 4)
PROCEDURE INDEX
PAGE
PROCEDURE
Removal
Installation
TOOLS:
Socket handle (breaker bar) with 3/4 in. drive
1-1/2 in. socket with 3/4 in. drive
Ratchet with 3/4 in. drive
15/16 in. open end wrench
1-1/8 in. socket with 3/4 in. drive
15/16 in. socket with 3/4 in. drive
1-1/8 in. open end wrench
Hoist (capable of lifting 3,000 pounds)
Lockwashers (MS35338-72) (6 required)
SUPPLIES:
Lockwashers (MS 35338-67) (2 required)
SPECIAL TOOLS: Sling (Item 31, Chapter 3, Section I)
PERSONNEL:
Three
REFERENCE:
TM 9-2350-222-10
Traverse turret so gun tube is pointing to right
PRELIMINARY PROCEDURES:
or left side (TM 9-2350-222-10)
Remove external handset box (page 16-193) (Early model only)
REMOVAL:
1.
Using 15/16 inch socket, loosen screw (A) (both sides) so top deck grille doors can be opened.
TA253552
Go on to Sheet 2
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |