Click here to make tpub.com your Home Page

Page Title: INSTALLATION-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
INSTALLATION-continued
Up
TM-9-2350-222-20-1-4 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
STARTER LOW VOLTAGE RELAY SOLENOID (SIDE MOUNTED) REPLACEMENT (sheet 1 of 2)

TM 9-2350-222-20-1-4
STARTER REPLACEMENT (Sheet 7 of 7)
11. Using screwdriver, secure small cable (P) onto
bottom front of solenoid relay with screw and
external tooth lockwasher (Q).
12. Install heavy cables (R) and (S) and tagged light
cable (T) onto lower terminal of starter switch
relay solenoid (U). Using 3/4 inch socket and
torque wrench, secured cables with nut and
lockwashers (V) to 168-192 lb-in (19-22 N-m).
13. Install two double-braided ground straps (H)
and two heavy cables (X) and (Y) and tagged
light cable (Z) onto large terminal at starter
motor (AA). Using 3/4 inch socket and torque
wrench, secure cables with nut and new
lockwashers to 168-192 lb-in (19-22 N-m).
14.
Install starter low voltage relay solenoid (page 10-34) (2D engine only),
15.
Connect powerplant for gound hop (page 5-48).
16.
Start engine (TM 9-2350-222-10),
17. Stop engine (TM 9-2350-222-10).
18. Using pliers, secure four bracket bolts with
lockwire (Item 59, Appendix D) (AB), exactly
as shown in the figure, to prevent them from
loosening.
19. Coat all exposed terminal fittings with
glyptol (Item 38, Appendix D).
20. Disconnect ground hop kit (page 5-62).
21. Install 2A powerplant (page 5-14) or 2D
powerplant (page 5-37).
End of Task
TA139587
10-32

Privacy Statement - Press Release - Copyright Information. - Contact Us