STARTER REPLACEMENT (Sheet 7 of 7)
11. Using screwdriver, secure small cable (P) onto
bottom front of solenoid relay with screw and
external tooth lockwasher (Q).
12. Install heavy cables (R) and (S) and tagged light
cable (T) onto lower terminal of starter switch
relay solenoid (U). Using 3/4 inch socket and
torque wrench, secured cables with nut and
lockwashers (V) to 168-192 lb-in (19-22 N-m).
13. Install two double-braided ground straps (H)
and two heavy cables (X) and (Y) and tagged
light cable (Z) onto large terminal at starter
motor (AA). Using 3/4 inch socket and torque
wrench, secure cables with nut and new
lockwashers to 168-192 lb-in (19-22 N-m).
14.
Install starter low voltage relay solenoid (page 10-34) (2D engine only),
15.
Connect powerplant for gound hop (page 5-48).
16.
Start engine (TM 9-2350-222-10),
17. Stop engine (TM 9-2350-222-10).
18. Using pliers, secure four bracket bolts with
lockwire (Item 59, Appendix D) (AB), exactly
as shown in the figure, to prevent them from
loosening.
19. Coat all exposed terminal fittings with
glyptol (Item 38, Appendix D).
20. Disconnect ground hop kit (page 5-62).
21. Install 2A powerplant (page 5-14) or 2D
powerplant (page 5-37).
End of Task