Click here to make tpub.com your Home Page

Page Title: CLEANING AND INSPECTION-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
CLEANING AND INSPECTION
Up
TM-9-2350-222-20-1-3 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
ENGINE OIL COOLER BYPASS VALVE ASSEMBLY REPLACEMENT (2D ENGINE) (Sheet 1 of 2)

TM
9-2350-222-20-1-3
TRANSMISSION MOUNTS (LEFT AND RIGHT) REPLACEMENT (Sheet 4 of 4)
3.
Using slip joint pliers, install lockwire (Item 59,
Appendix D) (D) between bushing (C) and
bracket (A).
4.
Remove from vise and position bracket (A) onto
transmission and, using 3/4 inch socket, install
three screws (E) and new lockwashers (F)
through mount on transmission into bracket (A).
Leave screws loose.
Position spacer (G) into bracket (A) and install
5.
bolt (H), through spacer (G), through mount (A),
and new lockwasher (J).
6.
With second person using 1-1/2 inch wrench to
hold bolt (H), use 1-1/2 inch socket and torque
wrench to tighten nut (K) to 380 to 415 lb-ft
(515-562 N°m).
7.
Position roller (1. ) onto screw (M) and install
screw (M) through bracket (A).
8.
Using bit screwdriver and 1/2 inch drive
ratchet to hold screw (M), use 1-5/16 inch
wrench to install new self-locking nut (N) into
screw (M).
NOTE
It may be necessary to turn universal
joint to gain access to screws (E).
9.
Using torque wrench and 3/4 inch socket,
tighten screws (E) to 70-75 lb-ft (95-102 N°m).
Install powerplant (page 5-37).
10.
End of Task
All data on pages 6-13 and 6-14 deleted.
6-12
Change 4

Privacy Statement - Press Release - Copyright Information. - Contact Us