Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
CLEANING AND INSPECTION
Up
TM-9-2350-222-20-1-3 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
TRANSMISSION MOUNTS (LEFT AND RIGHT) REPLACEMENT (Sheet 1 of 4)

TM 9-2360-222-20-1-3
ENGINE MOUNTS (LEFT AND RIGHT) REPLACEMENT (Sheet 3 of 3)
INSTALLATION:
Position bolt (A) through bracket (B) and install
1.
nut (C). Using 1-1 /16 inch wrench to hold nut
(C) and 1-1/8 inch socket, tighten bolt (A).
Position bolt (D) through new lockwasher (E),
2.
bracket (B), mount (F), mounting (G), mount
(H), and bushing (J). Use 1-1/8 inch socket
tighten bolt (D) while holding bushing (J) with
3/4 inch drive T-slide and 36 inch bar
extension.
Using 1/2 inch socket, install two screws (K)
3.
through new lockwashers (L) and bracket (M)
into mounting (G).
Install 2A powerplant (page 5-14) or 2D
4.
powerplant (page 5-37).
TA139375
End of Task
6-8

Privacy Statement - Press Release - Copyright Information. - Contact Us