Click here to make tpub.com your Home Page

Page Title: INSTALLATION-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
INSTALLATION-continued
Up
TM-9-2350-222-20-1-3 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
2D ENGINE POWERPLANT TESTS (GROUND HOP) (Sheet 1 of 15 )

TM 9-2350- 222-20-1-3
POWERPLANT REPLACEMENT (2D ENGINE) (Sheet 23 of 23)
58. If engine, transmission, or accelerator control linkage was replaced. check accelerator control
linkage adjustment (page 7-415). Adjust linkage if necessary (page 7-415).
59. Install upper engine access cover (page 16-40).
60. Install right angle drive, pump, and clutch (page 18-104).
61. Connect battery ground straps (page 10-283),
62. Install transmission shroud (page 9-23).
63. Install top deck (page 16-23).
64. Remove blocks from both tracks at front and rear.
65. Perform operational test (TM 9-2350-222-10).
End of Task
5-47

Privacy Statement - Press Release - Copyright Information. - Contact Us