Click here to make tpub.com your Home Page

Page Title: INSTALLATION-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
INSTALLATION-continued
Up
TM-9-2350-222-20-1-3 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
INSTALLATION-continued

TM 9-2350-222-20-1-3
POWERPLANT REPLACEMENT (2D ENGINE) (Sheet 22 of 23)
53. Reaching through engine access cover
opening, use adjustable wrench to install
tachometer cable (AP) to adapter (AQ).
Position generator air duct (AR) to bulkhead
54.
wall.
Using 7/16 inch wrench, install six screws (AS)
55.
to hold generator air duct (AR) to bulkhead
wall.
56. If engine, transmission, or shifting control linkage was replaced, check shifting control linkage
adjustment (page 11-2). Adjust linkage if necessary (page 11-2).
check steering control linkage
57. If engine, transmission, or steering control linkage was replaced,
adjustment (page 15-2). Adjust linkage if necessary (page 15-2).
TA140238
Go on to Sheet 23
5-46

Privacy Statement - Press Release - Copyright Information. - Contact Us