Click here to make tpub.com your Home Page

Page Title: INSTALLATION-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
INSTALLATION-continued
Up
TM-9-2350-222-20-1-3 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
INSTALLATION-continued

TM 9-2350-222-20-1-3
POWERPLANT
REPLACEMENT (2D ENGINE) (Sheet 20 of 23)
45.
On early model, reach through engine
access cover opening and use 7/16 inch
wrench to install accelerator bolt (AC) to
hold accelerator linkage clevis (AD) to rod
end (AE).
45.1. On late model, reach through engine
access cover opening and mount rod ends
(AE.1) to accelerator linkage lever (AD.1)
and fuel shutoff clevis (AD.2).
45.2. On late model, install two self-locking bolts
(AE.3). Using 7/16 inch wrench, tighten
both bolts (AE.3).
EARLY MODEL
46.
On early model, reach through engine access
cover opening and remove protective
coverings from two primary fuel lines (AF)
and quick-disconnect fittings (AG).
46.1 On late model, reach through engine access
cover opening and remove protective
coverings from primary fuel line (AF.1)
and quick-disconnect fitting (AG.1).
LATE MODEL
47.
On early model, reach through lower engine
access cover opening and manually connect
two priming fuel lines (AF) to quick-discon-
nect fittings (AG).
47.1 On late model, reach through lower engine
access cover opening and manually connect
priming fuel line (AF. 1) to quick-disconnect
fitting (AG.1),
Go on to Sheet 21
TA249056
5-44.1/(5-44.2 blank)
Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us