Click here to make tpub.com your Home Page

Page Title: INSTALLATION-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
INSTALLATION-continued
Up
TM-9-2350-222-20-1-3 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
INSTALLATION-continued

TM 9-2350-222-20-1-3
POWERPLANT REPLACEMENT (2D ENGINE) (Sheet 19 of 23)
37.
Alining steering rod linkage flats, install
capscrew (X).
38.
Using 7/16 inch wrench, tighten capscrew
(X).
39.
Remove protective coverings from air cleaner
outlet elbow (Y) and turbosupercharger elbow
(Y.1) on each side of powerplant.
40.
Manually install two air cleaner outlet hoses
(Z) on each side of powerplant.
41.
Using socket, tighten adjusting nut (AA)
o n clamp (AA.1) to eliminate clearance
between hasp and "T" bolt. Turn nut one
a d d i t i o n a l turn.
41.1
Using socket and torque wrench, tighten
nut of clamp (AA.2) to 25 to 35 lb. in. (3
to 4 N°m).
Go on to Sheet 19.1
TA249054
Change 2
5-43

Privacy Statement - Press Release - Copyright Information. - Contact Us