Click here to make tpub.com your Home Page

Page Title: INSTALLATION-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
INSTALLATION-continued
Up
TM-9-2350-222-20-1-3 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
INSTALLATION-continued

TM 9-2350-222-20-1-3
POWERPLANT REPLACEMENT (2D ENGINE) (Sheet 16.1 of 23)
20.1 With shift lever in park `P' position and bellcrank (G,1) fully clockwise, place inner pushrods (G.2) of
control assemblies (G.3 and G.4) in connected position.
20.2. Move bellcrank (G.1) fully counterclock wise.
NOTE
M o v i n g bellcrank counter-
clockwise will close gap
between control assemblies.
20.3, Manually tighten disconnect nut (G.5).
20.4. Using adjustable wrench on flats of control
assembly (G.3) and torque wrench with 7/8
inch crowfoot, tighten disconnect nut (G.5)
to 35-50 lb-in (8.9-12.7 N.m).
20.5. Position rod end (G.6) of control assembly
to bellcrank (G. 1) and install straight pin
(G.7).
20.6. Using pliers, install new cotter pin (G.8)
through end of straight pin (G.7). Bend
ends of cotter pin.
Go on to Sheet 16.2
TA253173
Change 1 5-40.1

Privacy Statement - Press Release - Copyright Information. - Contact Us