INSTALLATION-continued
Up
TM-9-2350-222-20-1-3 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
INSTALLATION-continued

TM 9-2350-222-20-1-3
POWER PLANT REPLACEMENT (2D ENGINE) (Sheet 16 of 23)
16.
Using 1-1/2 inch socket, install two flat
washers (D), two new lockwashers (E), and
two capscrews (F).
17.
Using torque wrench and 1-1/2 inch socket,
tighten two capscrews (F) 380 to 420 lb-
ft (515 to 570 N·m).
18.
Connect final drive adapters and universal
joints with final drive flanges (page 12-14,
steps 14, 15, and 17 thru 21).
Manually raise guide lock (G).
19.
Push powerplant guide forward until lockring
20.
snaps into place. Guide is now locked into
position.
NOTE
If you have an early model
vehicle, go to step 21.
If you
have a late model vehicle, do
steps 20.1 thru "20.1 1 and skip
steps 21 thru 26.
NOTE
If parking brake was tied to
rear outrigger, remove at this
time.
21. Position parking brake control rod (H)
onto transmission.
22. Position parking brake control rod (H)
under retaining clip (J).
Go on to Sheet 16.1