Click here to make tpub.com your Home Page

Page Title: REMOVAL-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
REMOVAL-continued
Up
TM-9-2350-222-20-1-3 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
REMOVAL-continued

TM 9-2350-222-20- 1-3
POWERPLANT REPLACEMENT (2D ENGINE) (Sheet 10 of 23)
CAUTION
Check all disconnected rod and
line ends, hoses, and cables to
make sure they will be out of the
way during powerplant removal.
32.
Connect hoist hook to engine and
transmission sling. Make sure hoist
hook is put through hole used to lift
powerplant.
33.
Using hoist with engine and trans-
mission sling, position sling over
powerplant so T-end is to front of
vehicle.
34.
Attach four cable hooks of engine
and transmission sling to four lifting
eyes on powerplant. Make sure hook
ends are toward outside of vehicle.
35.
Position personnel to guide powerplant as
it is hoisted out of vehicle.
Go on to Sheet 11
Change 4
5-34

Privacy Statement - Press Release - Copyright Information. - Contact Us