Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 5-2. Application of Material for Tiedown of the M9 ACE on the M870 Semitrailer (Fig 5-2)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
CHAPTER  5 HIGHWAY  TRANSPORTABILITY  GUIDANCE
Up
TM-55-2350-262-14 Truck 5 Ton 6x6 M939 Series/ M939A1 Series/ M939A2 Series Manual
Next
figure 5-1 Blocking diagram of the semitrailler, M870

T M 5 5 - 2 3 5 0 - 2 6 2 - 1 4 (2) The H-frame shoring should be installed raised to the travel position by using the truck- between the tracks, as shown in figure 5–1. tractor winch cable, and the semitrailer must be (3) The vehicle should be parked, with the connected to the M920 truck tractor. brake  set,  as  shown  in  figure  5-2.  The  dozer  blade (5) Data for the application of material re- should be lowered to the floor of the trailer. quired to restrain the vehicle are provided in table (4)  The  M870  semitrailer  gooseneck  must  be 5-2. Table 5-1. Bill of Materials for Blocking and Tiedown of the M9  ACE on the M870 Semitrailer Approximate Item Description Quantity Lumber Douglas-fir, or comparable, straight grain, free from material defects; Fed 65 linear feet Spec  MM-L-751H:  2-  x  4-inch Wire rope* 6 x 19, IWRC: improved plow steel; preformed regular-lay; table X, Fed Spec 90 feet R-W-410:    5/8-inch Clamps* Wire rope, U-bolt clips, saddled, single-grip, steel, Crosby heavy-duty, or 24 equal;  MIL-STD  16842  5/8-inch Thimbles Standard, open-type: 5/8-inch 8 Nails Common, steel; flathead, bright or cement-coated; para 3.6.11.2 Fed Spec 100 FF-N-105B:  12D  (3-1/4-inch) *Suitable capacity chains and load binders may be substituted for 5/8-inch wire rope and clamps. Table 5-2. Application of Material for Tiedown of the M9 ACE on the M870 Semitrailer (Fig 5-2) Item No.  Required Application A 2 Side blocking, 2- x 4- x 120-inch lumber (doubled). Pre-position. Nail first piece to trailer floor with one 12d nail every 8 inches. Nail second piece to first in a like manner. B 2 Lateral bracing, 2- x 4-inch x length-cut-to-fit lumber (doubled). Pre-position. Nail first piece to trailer floor with one 12d nail every 8 inches. Nail second piece to first in a like manner. C, D,E,F 8 Thimble, open-type, 5/8-inch. Place one on each M9 ACE tiedown (front and back) and on each semitrailer outside tiedown ring to be used. C,D,E,F 4 Wire rope, 5/8-inch. Attach, in a complete loop, through thimbles on the vehi- cle tiedown and through the thimbles on the semitrailer outside tiedown rings on the same side. 24 Clamp, 5/8-inch. secure the ends of the wire rope with four clamps each. Se- cure the thimbles with one clamp each. 5-2