Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 2-1. Preventive Maintenance Checks and Services for M-9 ACE - Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Table 2-1. Preventive Maintenance Checks and Services for M-9 ACE - Continued
Up
TM-5-2350-262-10 Armored Combat Earthmover (ACE) M-9 (2350-00-808-7100) Manual
Next
Table 2-1. Preventive Maintenance Checks and Services for M-9 ACE - Continued

TM 5-2350-262-10 2-30.6        Change 6 Item No. Interval Location Item to Check/ Service Crewmember Procedure Not Mission Capable if: 41 Weekly NBC System/ MCS if equiped Table 2-1. Preventive Maintenance Checks and Services for M-9 ACE - Continued WARNING If a mission requires the use of NBC equipment, ensure that either the MCS unit, which incorporates its own NBC air heater and air purifier are installed and operational. Without the MCS unit or the NBC equipment turned on, there is no adequate protection against the threat and exposure to nuclear, biological, and chemical warfare. Failure to comply may result in injury or death to personnel. a. Functionally check the NBC filtration system. Check for presence and proper operation of spring clip. Check for presence of hose, heater, and caps, and any damage to hose, heater and caps that may impair proper operation of NBC filteration system. b. Check that communication is possible while wearing NBC mask. c. If MCS equipped, check MCS control panel for proper operation in all temperature modes. d. Press test light to verify that test light is operational. e. If test light remains illuminated after being released, filter installation is incorrect. Notify unit maintenance. f. Check hoses and cage connector for damage to missing components. 42.1 Weekly Vent Fan Filter Check element for any restrictions to  airflow.  Remove  restrictions. 42 Weekly Scraper  and Dozer Cutting Edges, Side Cutting Edges and End Bits Check for damage and ware. Allowable wear limits on cutting edges are approximately 1/4 inch (6.4 mm) from mold board. Exceeds allowable limits of 1/4 inch from mold board.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing