TM 10-4510-209-13&P
UNIT MAINTENANCE
CONTAINERIZED LATRINE (CL)
CONTAINERIZED LATRINE SYSTEM (CLS)
FLOOR MAT
REPLACE
INITIAL SETUP
Tools
Personnel Required
One (1)
Materials/Parts
Equipment Condition
CL/CLS operating.
REPLACE
Replace the Floor Mat
WARNING
Protective clothing and equipment must be worn. Heavy-duty rubber apron, rubber
gloves, safety splash goggles and/or face shield are required when potential exists for
contact with wastewater or contaminated surfaces. Wastewater and surfaces may be
contaminated with pathogenic microorganisms, bacteria or viruses, which present a risk
of serious illness or death to personnel.
NOTE
Do not remove any fixed equipment, such as the sink stand, in order to remove or install
the floor mat. Make clearance cuts to allow the mat to fit around items such as sink stand
legs.
1. Remove the damaged or otherwise unserviceable floor mat (1).
2. Use the old floor mat as a template to cut the new floor mat (1) from bulk rubber matting.
3. Install the replacement rubber mat (1) in the CL/CLS.
0037 00-1