TM 10--3510--221--10
0009 00--10
LAUNDRY ADVANCED SYSTEM OPERATION UNDER USUAL CONDITIONS
ASSEMBLY AND PREPARATION FOR USE -- Continued
0009 00
ASSEMBLY AND PREPARATION FOR USE -- Continued
D. Install Railing and Awning
NOTE
When securing railings to ISO frame, misalignment of mating holes for quick--connect
pins is an indication that platform is not level. This problem can be corrected by
slightly raising or lower platform as necessary.
1. Raise and secure railing (1) as follows:
a. Lift railing (1) up to vertical position.
b. Pull quick--connect pin (2) out of railing (1) and gate (3).
c. Swing gate (3) over and mate with ISO frame (4).
d. Install quick--connect pin (2) to secure gate (3) to ISO frame (4).
e. Flip four support brackets (5) over railing (1).
1
2
4
3
5
1