TM  55-1520-240-23-9 11-14.1 REPAIR  FINISH OF BELLCRANKS  AND  CONNECTING LINKS (Continued) 11-14.1 NOTE This  is  a  complete  repair,  based on  coatings  and  primer  missing down  to  aluminum  base  metal.   If damage  does  not  extend  to  metal,  it is  only  necessary  to  replace  missing coatings. 1. Clean  the  damaged  area.   Use  a  clean  cloth (E120) damp with naphtha  (E245) or dry cleaning solvent  (E162).   Wear  gloves  (E184.1)  and goggles. 2. Inspect  damaged  area: a. If  damage  extends over  stenciled  markings, tag  and  record  markings. b. If  damage  extends to  aluminum  base  metal, go  to  step  3. c. If  yellow primer is not damaged, go  to  step  8. d. If  basecoat  is not damaged,  go  to  step  15. PREPARE  BARE  METAL 3. Lightly  sand  damaged  area  to  blend  edges  of primer, basecoats,  and  topcoats.   Use  abrasive paper  (E9)  or  finer. 4. Remove  sanding residue by cleaning  as in step  1. 5. Prepare  a  solution  of  3 ounces  alodine  powder (E65) and  0.5 ounce  of  concentrated  nitric  acid (E22) in  1 gallon  of water  to  the  damaged  area. Use  brush  (E86) and  wear  gloves  (E184.1)  and goggles.  Allow about  5 minutes  for  a  coating  to form.  Blot  area  clean  with  cloths  (E120) wet  with clean  cold  water,  or  flush  with  clean  cold  water. Allow  metal  to  air  dry or blow  dry with  clean, dry, oil-free  compressed  air. INSPECT APPLY  PRIMER 6. Clean  damaged  area  as in  step  1. 7. Thin  epoxy primer (E292.1) with an equal amount of  toluene  (E422).   Apply one  coat  of  thinned primer to  damaged  area  (TM  55-1500-345-23). Let  dry  for at least  4 hours. NOTE ALBI base  coat must  be  applied  within 24  hours of primer application. APPLY  BASECOAT 8. Clean  primed  area  as  in  step  1. 9. Lightly scuff-sand  primer and  surrounding  area  to blend  edges  of  existing  basecoats  and  topcoats. Use  abrasive  paper (E9) or finer. 10. Remove  sanding residue by cleaning  as in step  1. 11. Thoroughly mix basecoat (E135.3).  Apply a  coat over  the  primed  area.   Let  air  dry  at  least  24 hours at 70ºF (21ºC). Do not use heating devices to  accelerate  drying  time  between  applications. 12. Lightly  scuff-sand  painted  area.   Use  abrasive paper  (E9) or finer. NOTE Total  basecoat  thickness requirement is  0.010  to  0.012  inch  (TM 55-1500-345-23). 13. Repeat  steps  11  and  12  until  three  coats  of basecoat  (E135.3)  have  been  applied.   Let final coat  air dry  for at  least  24  hours at 70ºF (21ºC) or force  dry  for 12  hours at 120ºF (49ºC). INSPECT APPLY  TOPCOAT 14. Clean  painted  area  as  in  step  1. 15. Lightly  scuff-sand  basecoat  and  surrounding area  to  blend  edges  of  existing  topcoat.   Use abrasive  paper  (E9)  or  finer. 16. Remove  sanding residue by cleaning  as in step  1. 17. Thoroughly mix topcoat (E135.4).  Apply a  coat of topcoat over the  basecoat.  Let dry for at  least  24 hours at 70ºF (21ºC). Do not use heating devices to  accelerate  drying  time  between  applications. NOTE Total  top  coat  thickness  requirement is  0.004  to  0.006  inch  (TM 55-1500-345-23). 18. Repeat  steps 15  thru  17.   Let  final  coat  dry  for at  least  48  hours  at  70ºF  (21ºC)  or 24 hours at  120ºF (49ºC). INSPECT 19. Replace  any markings that were  removed.  Refer to  step  2.  Use  marking  ink  (E205). FOLLOW-ON MAINTENANCE: None END  OF  TASK 11-57