TM  55-1520-240-23-9 11-6.3 ISOLATION PROCEDURES FOR CHECKING CONTROLS LOOSENESS (Continued) 11-6.3 31. Mount  support  (31)  on  structure  (47).   Position dial  indicator  (33)  against  rod  end  bearing  (48). Set indicator  at  mid-stroke. 32. Attach  dial indicating  scale  (35)  to  bellcrank (43). Use  twine  (E433). 33. Have  helper  pull  scale  (35)  down  until  scale indicates  10 pounds.   Record  indicator  (33) reading  ‘C’. 34. Pull  scale  (35)  up  until  scale  indicates  10 pounds.  Record  indicator  (35)  reading  ‘D’. 35. Subtract  reading  ‘D’  from  reading  ‘C’.   Result shall  not  be  more  than  0.063  inch.   If  more, perform  Tasks 11-7  and  11-9. 36. Remove  scale  (35)  from  bellcrank  (43). 37. Position  indicator  (33)  against rod  end  bearing (49).   Set  indicator  at  mid-stroke. 38. Attach  scale  (35)  to  bellcrank  (50).   Use  twine (E433). 39. Repeat steps 33,  34, 35,  and  36. 40. Remove  indicator  (33)  and  support (31). 41. Remove  nut  (39),  two  washers  (40  and  41),  and bolt  (42)  from  link  (44). 42. Position  link (44)  on  bellcrank  (43).   Install  bolt (42),  two  washers (41  and  40)  and  nut  (39). 43. Torque  nut  (39)  to  30 to 45 inch-pounds.  Install cotter  pin  (38). 44. Repeat  steps  41  and  42  for  link  (46)  and bellcrank  (45). 45. Check  two  bolts  (42  and  51).   Bolts  shall  not rotate  with  torque  less  than  10 inch-pounds. There  shall  be  no  axial  looseness.  If  bolt  rotates or  is  loose,  add  washer  under  nut  and  repeat step  43. 11-31