TM  55-1520-240-23-9 11-6.3 ISOLATION  PROCEDURES FOR CHECKING CONTROLS LOOSENESS (Continued) 11-6.3 1. Working  from  forward  left  work platform, install second  stage  rig  pin  (T135)  (1)  through  support (2),  four  bellcranks (3,  4,  5, and  6)  and  in  fitting (7). 2. Position  wood  block  (8)  between  stop  bolt  (9) and  bellcrank  (3).  Hold  bellcrank  against block. Install  strap  (10)  between  bellcrank  (11)  and support  tube  (12).  Use  strap  (E376). 3. Position  wood  block  (13)  between  stop  bolt (14) and  bellcrank  (5).  Hold  bellcrank  against block. Install  strap  (15)  between  bellcrank (16)  and  stop bolt  (17).   Use  strap  (E376). 11-28