TM  55-1520-240-23-9 11-6.3 ISOLATION PROCEDURES  FOR  CHECKING  CONTROLS  LOOSENESS 11-6.3 INITIAL  SETUP Applicable Configurations: All Tools: Aircraft  Mechanic’s Tool  Kit, NSN 5180-00-323-4692 Second  Stage  Rig  Pin  (T135) Wood  Blocks  (2) Scale,  Dial  Indicating, 0  to  50  Pounds Dial  Indicator,  0  to  0.5  Inch Torque  Wrench,  0  to  50  Inch-Pounds Torque  Wrench,  30  to  150  Inch-Pounds Materials: Straps  (E376) Twine  (E433) Personnel  Required: Medium  Helicopter Repairer (2) Inspector References: Task  2-2 Task  2-3 Task  2-81 Task  2-107 Task  9-69 Task  11-7 Task  11-7.1 Task  11-9 Equipment  Condition: Battery Disconnected  (Task  1-39) Electrical  Power Off Hydraulic Power  Off Servocylinder  Safety  Blocks  (T31)  Installed  (Task 11-28) Forward  and  Aft  Servocylinders  Connecting  Links Disconnected  (Task 11-192) Cockpit  Controls at  Neutral  (Task  11-33) Forward  and  Aft Work  Platforms  Open  (Task  2-2) Servocylinder  Control  Valves  Checked  for Friction (Task  11-6) Tunnel  Controls Checked  for Binding  (Task  11-6.1) Controls  Checked  for  Overall  Looseness  (Task 11-6.2) 11-27