TM  55-1520-240-23-9 11-6.1 CHECK TUNNEL CONTROLS  FOR  BINDING (Continued) 11-6.1 1. Have  helper in  cockpit  slowly  move  pedals  (1), control  stick  (2),  and  thrust  control  (3) through full  range  of  travel. Use  care when feeling components for vibration.  Serious  injury  to  personnel can  result. 2. Working  from  tunnel  walkway,  check  the following: a. Control  arms  (4)  and  idlers  (5)  for  jerking movements.   Feel  for vibration.   If  binding or  roughness  is  found,  clean  and  lubricate bearings  (Task  11-2). b. Check bolts  (6) for jerky rotation  and  listen  for cracking  or  squeaking  sounds. c. Connecting  links  (7) for vibration  and  listen for  cracking  or  squeaking  sounds.  If  binding or  roughness  is  found, inspect  links (Tasks 11-7  thru  11-9). 3. Set cockpit  controls to  neutral. FOLLOW-ON MAINTENANCE: Remove  hydraulic  power. Remove  electrical  power. Close  tunnel  access covers (Task  2-2). Close  pylon  access  doors  (Task  2-2). Install forward  transmission  aft fairing  (Task 2-2). END  OF  TASK 11-21