TM  55-1520-240-23-7 8-7 INSTALL EMERGENCY  POWER SWITCHES (Continued) 8-7 3. Install  switch  (2) in  switch  bracket  (6).  Make  sure tab  of  locking  ring  (5) engages slot  (7) of switch bracket  (6). 4. Install  lockwasher (8)  and  nut (9). INSPECT FOLLOW-ON MAINTENANCE: Operational  check  of  emergency  power  warning system  (TM  55-1520-240-T). Close  nose  enclosure  door (Task  2-2). END  OF  TASK 8-27