TM  55-1520-240-23-6 7-10 FLUSHING FLIGHT CONTROL HYDRAULIC SYSTEM  (PRESSURE LINES) (Continued) 7-10 FLUSHING  FORWARD  UPPER  CONTROLS PRESSURE  SYSTEM NOTE Forward  pivoting  servocylinder is reached  from  right  work  platform. Forward  swiveling  servocylinder  is reached  from  left  work  platform. Pivoting  servocylinder  only  shown here. 7. Remove  bypass  hoses (3) from  pressure  lines (4 and  5) at  both  forward  servocylinders (6). 8. Plug  pressure  lines (4  and  5). Keep  test  stand  bypass  valve  closed. Otherwise,  contaminants  could reenter the  system. 9. Turn  on  test stand.  Set  stand  to  10 gpm at 500 psi.   Slowly  increase  stand  pressure  to  700 psi and  hold  for 15 minutes.  Check for leaks. 10. Reduce  pressure  and  shut  down  test stand. 11. Remove  plugs  from  pressure  lines (4  and  5). 12. Connect  bypass  hose  (3)  to  pressure  lines  (4 and  5). NO  BREAK  - WORK  HARDER FLUSHING  AFT UPPER  CONTROLS  PRESSURE SYSTEM NOTE Aft  pivoting  servocylinder is  reached from  left work platform.   Aft  swiveling servocylinder  is reached  from  right work  platform.  Pivoting  servocylinder only shown  here. 13. Remove  bypass  hoses (7) from  pressure  lines (8 and  9) at  both  aft  servocylinders  (10). 14. Plug  pressure  lines (8  and  9). 15. Repeat  steps 9  and  10. 7-66