TM  55-1520-240-23-6 7-9 PREPARE  FLIGHT CONTROL HYDRAULIC  SYSTEM  FOR  FLUSHING  (PRESSURE LINES) (Continued) 7-9 NO.  1  PUMP 14. Remove  pressure  line  (44)  from  No.   1  flight control  pump  (45).  Cap  open  port (46) on  pump. 15. Attach  return  line  (47) from test stand to  pressure line  (44) with  union  (48). NO  BREAK  -  WORK  HARDER NO  BREAK  -  WORK  HARDER NO  BREAK  -  WORK  HARDER FOLLOW-ON MAINTENANCE: Flush  flight  control  system  pressure  lines (Task  7-10). END  OF  TASK 7-63