TM  55-1520-240-23-6 7-6 REPLACE  ROSAN ADAPTERS  AND  REDUCERS (Continued) 7-6 25. Engage  serrations  (9) of fitting  (6)  with  proper wrench  from  table  1.  Tighten  fitting  to  minimum torque  from  table  2.   Make  sure  serrations  of Rosan  fitting  align  with  serrations in  port. NOTE Upon  reinstallation  of original  Rosan fitting, index  marks  should  align. 26. If  serrations  of lockring  (1)  and  port  (8) do  not align,  slowly increase  torque  toward  maximum until  serrations  align.   Do  not  exceed  maximum torque. 27. Clean  port hose.  Use  solvent  (E162). 28. Apply  enough  zinc  chromate  primer  (E291)  to port (8) and below fitting  lockring  (1) so primer will squeeze  serrations during  lockring  installation. 29. Install  reducer lockring  (1) while  zinc chromate primer is  still  wet  as  follows: a. Select  proper  size  lockring  drive  tool RF98-DEK  from  table  1. b. Place  drive  tool  over reducer  (14).   When properly  located  it  will  rest on  lockring  (1). c. Set lockring  (1).  Use  a  hammer,  arbor press, or hydraulic press.   Installation  is  complete when  tool bottoms  on  surface  of port  (8). 7-50