TM  55-1520-240-23-6 7-5 REPAIR  PERMASWAGE  PLUMBING (Continued) 7-5 FOLLOW-ON  MAINTENANCE: Connect  repaired  tube  to  structure. Fill  and  bleed  applicable  hydraulic  reservoir  (Tasks 7-16  or  7-335). Apply  hydraulic  power  to  helicopter  (Task  1-36  or 1-38). Check  repaired  tubing  for  leaks. Perform  operational  check  of  hydraulic  system  (TM 55-1520-240-T). Close  applicable  work  platforms  or  access  panels (Task  2-2). END  OF  TASK 7-44