TM  55-1520-240-23-6 7-4.2 TUBE  BENDING  (AVIM) (Continued) 7-4.2 9.1. Check  that  control  lever  (14.1)  is  set to  the  right, as  shown. 10. Adjust operating  arm  forming  nose  (15)  against follow-block  (14). NOTE The  distance  between  two  holes  in the  base  is  equal  to  12.5º. 11. Position  angle  stop  (16)  on  base  (2)  at correct position  to  obtain  desired  bend  (DIAL  H  DEG BEND  Column  of  Chart  B).  Allow  for  springback. Install  two  bolts  (17). 12. Advance operating  arm (18) with steady pressure until  angle  stop  (16)  is  met.  Use  extension  arm (19)  with  operating  arm  (18)  if additional leverage is  required. 13. Return  operating  arm  (18)  to  starting  position and  remove  follow-block  (14). 14. Release  lock handle  (13)  on  quick-lok  clamp  (6) and  remove  tube  (1). 15. Repeat steps  8  thru  14  for  all required  bends  in tube  (1). 7-25