TM  55-1520-240-23-6 7-4 INSTALL HYDRAULIC SYSTEM  PLUMBING  (GENERAL INFORMATION) (Continued) 7-4 INSTALLATION  OF TUBES 17. Place  containers  and  cloths  (E120) to  catch  and absorb  fluid  that drains during  installation. 18. Clear tubes with  low pressure  compressed  air. 19. Inspect  tubes  for  nicks,  dents,  and  deep scratches. 20. Do  not pull  tubes into  position  by  tightening  nuts. Position  tubes  properly  between  connecting points  to  avoid  stressing. 21. Do  not  bend  installed  tubes.  Remove  tubes  and bend  to  proper configuration  with  proper  tools. 22. Torque  tube  nuts (Task  1-13). 23. Anchor  tubes properly to  prevent  chafing. 24. Plug  all  open  ends if  tubes will not  be  connected immediately. FOLLOW-ON MAINTENANCE: Flush  hydraulic  system  (Refer  to  Index). Fill  and  bleed  hydraulic system (Refer to  Index). Close  access  panels  and  work  platforms (Task  2-2). END  OF  TASK 7-19