TM  55-1520-240-23-5 6-3 REMOVE  NO.  2 THRU NO. 6  FORWARD DRIVE  SHAFT 6-3 INITIAL  SETUP Applicable Configurations: All Tools: Aircraft  Mechanic’s Tool  Kit, NSN  5180-00-323-4692 Materials: Barrier  Material  (E80) Cloths  (E120) Personnel  Required: Medium  Helicopter  Repairer  (2) Equipment  Condition: Battery Disconnected  (Task  1-39) Electrical  Power  Off Forward  Drive  Shaft  Tunnel  Access  Covers  Open, As  Needed  (Task  2-2) Remove  Cabin  Tunnel  Smoke  Baffle  (Task 2-170.1) General  Safety  Instructions: Rotor  blades  will  turn  when  shaft rotates.   Turning  blades  can  injure personnel.  Keep  clear  of  blades as they  turn. 6-15