TM  55-1520-240-23-4 5-5 PRESSURE  TEST ROTARY-WING HEAD SEALS  AND PACKINGS (Continued) 5-5 Do  not  exceed  20 psi  when  testing seals.  High-pressure  air will  damage seals. 9. Pressurize  tank  (11)  to  3 to 5  psi.   Maintain pressure  for 10 minutes.  Check inboard  end  of pitch  housing  (15) for oil  leaks.  Check  oil  hole (16) at  tie-bar  hole  area  under pitch  housing. There  shall  be  no  leaks. 10. Increase  pressure  in  tank  (11)  to  15  to 20 psi. Maintain  pressure  for 5 minutes.  Check inboard end  of  pitch  housing  (15) for oil  leaks.   Check oil  hole  (16)  at  tie-bar  hole  area  under  pitch housing.  There  shall  be  no  leaks. 11. Loosen  pressurizing  filling  (14)  just  enough  to bleed  pressure.   When  gage  pressure  is  0  psi, remove  filling  and  packing  (13). 12. Install  packing  (13) and  plug  (12).  Torque  plug  to 25 inch-pounds.   Lockwire  plug.   Use  lockwire (E231). INSPECT TEST VERTICAL HINGE  PIN OIL TANK  SEALS AND PACKINGS 13. Check  oil  level in  sight indicator  (17).  Service  oil tank  (18) if  needed  (Task  1-59). 14. Remove  one  filler  plug  (19)  and  packing  (20). Install  pressurizing  fitting  (21)  and  packing  in tank (18).  Connect  test  setup  (6) to  pressurizing fitting. Do  not  exceed  20 psi  when  testing seals.  High  pressure  air  can  damage seals. 15. Pressurize  tank  (18)  to  3 to 5  psi.   Maintain pressure  for 10 minutes.   Check  tanks  (18  and 22), oil manifold  (23), and  lugs (24),  for  oil  leaks. There  shall  be  no  leaks. 16. Increase  pressure  in  tanks (18  and  22)  to  15 to 20 psi.  Maintain  pressure  for 5 minutes.  Check tanks,  oil  manifold  (23),  and  lugs  (24),  for oil leaks.  There  shall  be  no  leaks. 5-29