TM  55-1520-240-23-4 5-2 PREPARE ROTARY-WING  HEADS  FOR SHIPMENT OR STORAGE (Continued) 5-2 30. Align  record  receptacle  (47)  with  locator  pin  (48). Install  cover  (25)  on  container  (26).   Install  24 bolts (21),  washers  (22), lockwashers (23),  and nuts (24).  Tighten every fifth bolt until all are  tight. 31. Remove  plug  (49)  from  cover  (25). 32. Connect  air  test  line  (50)  to  cover  (25). Low  pressure  air  supply  must  be used.   Exceeding  test pressure  can damage  container. 33. Pressurize  container  (26)  to  3 psi max.  Check container  for  leaks.   Container  must  hold  3 psi for 1  hour. Be  careful  when  releasing  air  under pressure;  wear  goggles.   Personal injury  can  result. 34. Push  pressure  relief  valve  (51)  until pressure  in container  (26)  is  0 psi. 35. Disconnect  air  line  (50)  from  cover  (25). 36. Install  plug  (49)  in  cover  (25). FOLLOW-ON  MAINTENANCE: None END  OF  TASK 5-14