TM  55-1520-240-23-4 5-2 PREPARE  ROTARY-WING HEADS FOR SHIPMENT OR  STORAGE (Continued) 5-2 Head  is  heavy  and  can  injure personnel  if  it  drops.   Head  must be  supported  by  hoist  and  moved carefully to  prevent injury to personnel. 13. Lift head (1).  Use mobile  hoist device  (19).  Clean splines  (20).  Use  cloth  (E120)  damp  with  solvent (E162).   Wear  gloves  (E186). 14. Coat  splines  (20)  with  corrosion-preventive compound  (E153). 15. Remove  24  bolts (21), washers (22), lockwashers (23),  and  nuts  (24).   Remove  cover  (25). 16. Check  that  container  (26)  is  clean  and  dry. Remove  any  dirt  or  moisture. 17. Remove  nut  (27),  washer  (28),  clamp  plate  (29), and  upper  hub  cushion  (30). 18. Remove  six  nuts  (31)  and  washers  (32)  from three  clamp  angles  (33).   Remove  angles  and upper  lug  cushions  (34). 19. Check  that  lower  hub  cushion  (35)  and  three  lug cushions  (36)  are  in  place. 5-11