Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REMOVE AFT LANDING GEAR
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
INSTALL  FORWARD  LANDING  GEAR TOWING  SHACKLE
Up
TM-55-1520-240-23-3 CH-47D Heilcopter Manual
Next
REMOVE  AFT LANDING  GEAR (Continued)

TM  55-1520-240-23-3 3-27 REMOVE  AFT LANDING GEAR 3-27 INITIAL  SETUP Applicable Configurations: All Tools: Aircraft  Mechanic’s  Tool  Kit,  NSN  5180-00-323-4692 Socket,  1-1/16  Inch Socket,  1-1/8  Inch Socket,  1-1/2  Inch Slide  Hammer Container,  2  Quart Materials: Cleaning  Cloth  (E120) Chock  Blocks Personnel  Required: Medium  Helicopter  Repairer  (2) Equipment  Condition: Battery  Disconnected  (Task  1-39) Electrical  Power  Off Utility  Hydraulic  Pressure   Released   (TM 55-1520-240-T) Access  Panels  Opened  (Task  2-2)  (Left  or  Right  as Needed) Helicopter  Jacked  at  Aft  Fuselage  Jack  Pad  (Task 1-24) Shock  Strut  Deflated  (Task  1-72) NOTE This  procedure  can  be  used  for  left and  right  gears,  except  for  differences noted  in  task.   Right  gear  is  shown here. If  aft  left  gear  is  being  removed,  go to  step  5.   If  aft  right  gear  is  being removed,  perform  steps  1  thru  4. 3-67

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing