|
| |
Back Operator’s Preventive Maintenance Checks and Services -cont | Up TM-5-6635-386-12P Density and Moisture Tester Manual | Next APPENDIX A REFERENCES |
TM 5-6635-386-12&P
Table 5-1 Unit Preventive Maintenance Checks and Services
Location
Item
Item to
Not Fully Mission
No.
Interval
Check/ Service
Procedure
Capable If:
3
Semi-annually End Item
Perform leak test in accordance with
Leak test has not
Section 4, Para 4-25, 4-26 and
been performed in
4-27.
the last six months,
or tester fails leak
test.
5-9/(5-10 blank)
|