Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page  Title: Disassembly of ULV System
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-15.  Disassembly of LV System
Up
TM-5-3740-218-13P Pesticide Dispersal Unit Multicapabilty Helicopter Slung (PDU) Manual
Next
Figure 2-16.  Disassembly of ULV System

TM 5-3740-218-13&P (2)   Remove quick-release pin (5) at Connect Point 7 by applying upward pressure to outboard boom weldment (6). (3)   Pull back Karmlock ears and remove outboard boom weldment (6). (4)   Remove two quick-release pins (7 and 8) at Connect Points 8 and 9.  Remove two strutts (9 and 10). (5)   Remove two quick-release pins (11 and 12) at Connect Points 5 and 6.  Remove strut (13). (6)Remove Kamlock-release pin (14) at Connect Point 4.  Remove two struts (15 and 16). (7)   Remove quick-release pin (17) at Connect Point 3. (8)   Pull Kamlock ears back and remove outboard boom weldment (18) from center boom weldment (19) on pump and crosstube. (9)   Remove two quick-release pins (20 and 21) at Connect Points 1 and 2.  Remove two struts (22 and 23). (10) Clean and store booms in original containers. b. Disassembly of ULV System. (1)   Open crosstube gate valve (1, figure 2-16) and ball valve (2). (2)   Disconnect hydraulic quick-disconnect fitting (3) from hydraulic filter elbow fitting. (3)   Disconnect hydraulic quick-disconnect fitting (4) from hydraulic pump. (4)   Remove clamps (5) from Kamlock ears on center boom. (5)   Disconnect Kamlock hose ends (6 and 7) from center boom by opening Kamlock ears. (6)   Remove ULV boom (8) from ULV attach points on bucket assembly by removing two quick-release pins (9 and 10). (7)   Clean and store components in original containers. c.   Disassembly of SD System. (1)   Spin slinger to ensure no loose or foreign objects are in slinger. (2)   Disconnect left and right capacitive light switch wiring harnesses (1, figure 2-17) from each other. Disconnect left hopper assembly capacitive light switch wiring harness (2) from bucket wiring harness. (3)   Remove and cap four hydraulic fittings (3) from two hopper cylinders (4). (4)   Remove and cap two 1/4-in.  hydraulic fittings (5 and 6) from back of secondary hydraulic manifold (7). 2-50

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing