Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page  Title: Table 2-5. LV System Flow Rate -Water
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
ULV System Boom Assembly Pressure Adjustment
Up
TM-5-3740-218-13P Pesticide Dispersal Unit Multicapabilty Helicopter Slung (PDU) Manual
Next
Figure 2-11.  ULV System Operational Test

TM  5-3740-218-1 3&P Table 2-5.  LV System Flow Rate -Water Primary Hyd Pressure Boom Pressure D4-45 Nozzle Flow 300 psi 20 psi 8.5 gpm 450 psi 30 psi 10.5 gpm 500 psi 40 psi 12.2 gpm 675 psi 50 psi 13.6 gpm (3)   On hand control, make sure SYSTEM switch is set to OFF and POWER switch is ON.  Make sure gate valve is open. (4)   Place bucket under nozzle. (5)   Set key on engine to ON. (6)   Start engine with ENGINE START switch. CAUTION Note time before performing step (7) since application rate can only be determined if dispersal time is known.  During ground test, 30-minute operating time should not be exceeded; overheating and damage to equipment will occur. (7)   Note time and set SYSTEM switch to ON.  Check for hydraulic leaks, that EMPTY indicator is not lit, and that pressure gage on secondary hydraulic manifold assembly indicates 300 psi. (8)   Press DISPERSAL pushbutton.  After pre-determined time is up, release DISPERSAL pushbutton and set SYSTEM switch to OFF. (9)   Measure amount of pesticide collected in bucket and calculate application rate (para 2-10, f).  If application rate is incorrect, proceed with step (10).  If application rate is correct, proceed with step (12). (10) Loosen jam nut, adjust manifold pressure adjustment knob, then tighten jam nut. (11) Repeat steps (7) through (10) until application rate is correct. CAUTION Shut down hydraulic system immediately when EMPTY indicator lights, or damage to pump could occur. 2-30

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing