Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page  Title: ULV System Boom Assembly Pressure Adjustment
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-10.  ULV Boom Pressure Adjustment
Up
TM-5-3740-218-13P Pesticide Dispersal Unit Multicapabilty Helicopter Slung (PDU) Manual
Next
Table 2-5.  LV System Flow Rate -Water

TM  5-3740-218-13&P (2)   Fill bucket assembly with pesticide.  Use sight gages on side of tank. (3)   Connect hand control assembly to wiring harness. (4)   On hand control, make sure SYSTEM switch is set to OFF and POWER switch is ON.  Make sure gate valve is open. (5)   Set key on engine to ON. (6)   Start engine with ENGINE START switch. (7)   Set SYSTEM switch to ON.  Check for hydraulic leaks, that EMPTY indicator is not lit, and that pressure gage on secondary hydraulic manifold assembly indicates 300 psi. WARNING Make sure muffler and engine are cooled down before attempting assembly, disassembly, or adjustments.  Hot muffler and engine components can cause burns. (8)   If pressure is not 300 psi, loosen jam nut on secondary manifold pressure adjustment knob and adjust knob for desired pressure. (9)   Tighten jam nut and repeat steps (7) and (8) until pressure is correct. CAUTION Do not run system longer than three minutes after EMPTY indicator lights, or damage to pump could occur. (10) When adjustment is complete, or if EMPT'Y indicator lights, set SYSTEM switch to OFF, POWER switch to OFF, and key on engine to OFF. (11) Remove fitting (1), pressure gage (4), and test tee (3).  Install fitting (1) back into nozzle. c. LV System Operational Test.  This test consists of verifying PDU function and final adjustment of application rate.  Sample flow rates using water at ambient temperature of 70°F (21.1°C) are given in table 2-5.  Rates will vary with temperature, humidity, if chemicals are used, oil temperature, and other conditions. (1)   Fill bucket assembly with pesticide.  Use sight gages on side of tank. (2)   Connect hand control assembly to wiring harness. 2-29

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing