Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page  Title: Figure 2-9. LV Boom Pressure Assembly Adjustment
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
INITIAL ADJUSTMENTS AND TESTS
Up
TM-5-3740-218-13P Pesticide Dispersal Unit Multicapabilty Helicopter Slung (PDU) Manual
Next
Figure 2-10.  ULV Boom Pressure Adjustment

TM 5-3740-218-13&P WARNING Make    sure    muffler    and    engine    are    cooled    down    before    attempting    assembly, disassembly, or adjustments.  Hot muffler and engine components can cause burns. (9) If pressure is now between 900-1200 psi, loosen jam nut (1) on primary manifold pressure adjustment knob (2), shown in figure 2-9, and adjust knob for desired boom pressure. Figure 2-9.  LV Boom Pressure Assembly Adjustment NOTE Turning knob clockwise decreases pressure; counterclockwise increases pressure. (10) Tighten jam nut (1) and repeat steps (8) and (9) until pressure is correct. CAUTION Do not run system longer than 3 minutes after EMPTY indicator lights, or damage to pump could occur. (11) When adjustment is complete, or if EMPTY indicator lights, set SYSTEM switch to OFF, POWER switch to OFF, and key on engine to OFF. 2-27

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing