Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page  Title: PREPARATION FOR USE (cont)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-8.  Assembly of SD System (Sheet 2 of 2)
Up
TM-5-3740-218-13P Pesticide Dispersal Unit Multicapabilty Helicopter Slung (PDU) Manual
Next
INITIAL ADJUSTMENTS AND TESTS

TM 5-3740-218-13&P (9) Align hopper assembly (11) mounting holes with downspout mounting holes. (10) Secure hopper assembly (11) to bucket using 6 clips (15), 12 lockwashers (16), 6 bolts (17), and 6 nuts (18). Hand-tighten nuts (18) loosely until motor and slinger assembly has been installed and adjusted. (11) Repeat steps (9) and (10) to install other hopper assembly (12). (12)  Connect  left  and  right  capacitive  light  switch  wiring  harnesses  (13)  to  each  other.    Connect  left  hopper assembly capacitive light switch wiring harness (5) to bucket wiring harness. NOTE Two people are required to install the motor and slinger assembly. (13)  Install  motor  and  slinger  assembly  (19)  under  bucket  and  secure  to  engine  platform  (20)  using  four  bolts (21), eight washers (22), and four nuts (23). Hand-tighten nuts loosely to allow for adjustment of chutes. (14) Using a 3/8-in.  open-end box-end wrench, loosen two chute inner bolts (24).  Using a 3/8-in.  socket-end wrench, loosen nut on lower bracket (25).  Adjust chute up or down and pivot chute assembly as required to allow free motion of hopper and slinger.  Tighten hardware. (15) Remove cap and connect 3/4-in.  hose (26) to quick-disconnect fitting on back of hydraulic filter (27). (16)  Route  1/2-in.    hydraulic  hose  (28)  under  throttle  cable  and  in  front  of  secondary  hydraulic  manifold  (29). Connect hose (28) to front, bottom quick-disconnect fitting (30) on primary hydraulic manifold (31). (17) Connect two 1/4-in.  hydraulic fittings (32 and 33) to back of secondary hydraulic manifold (29), matching up markings on fittings with markings on manifold (A to A, B to B). (18) Remove caps and connect four hydraulic fittings (34) to two hopper cylinders (14). (19) Hand spin slinger to ensure freedom of movement.  Check for loose connections and foreign objects. (20) Complete SD system operational test (para 2-10). 2-25

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing