Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page  Title: PREPARATION FOR USE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-5.  Battery Installation
Up
TM-5-3740-218-13P Pesticide Dispersal Unit Multicapabilty Helicopter Slung (PDU) Manual
Next
Figure 2-6.  Assembly of LV System

TM  5-3740-218-13&P (10) Install battery cover (1), aligning holes on cover with battery holddown bolts (10). (11)  Secure battery cover (1) using two washers (3) and two nuts (2). e. Fill bucket with water and check for leaks.  Drain bucket. f. Assemble the PDU for LV system operation. NOTE Both   LV   boom   assemblies   are   assembled/installed   the   same   way.      The   following procedure is for the left-side LV boom assembly. Booms  and  struts  are  number  and  color-coded;  right  is  green  and  red  is  left.    The Connect Points referred to in this procedure are the places on the boom assembly where struts and booms with like colors and numbers are to be joined. Strut tabs must point up.  Nozzles must face rear of bucket.  End of strut should be at a 15-degree angle to centerline of boom. (1) Connect Points 1 and 2: Install two struts (1 and 2, figure 2-6) at top of right bucket leg weldments and secure to strut anchors (3 and 4) using two quick-release pins (5 and 6). (2) Install outboard boom weldment (7) on center boom weldment (8) of pump and crosstube assembly.  Secure by closing Kamlock ears over end of boom weldment.  Do not install clamp (9) at this time. (3) Connect Point 3: Using upward pressure, connect other ends of struts (1 and 2) to outboard boom weldment (7) at Connect Point 3 using quick-release pin (10). (4) Connect Point 4: Attach struts (11 and 12) to outboard boom weldment (7) at Connect Point 4 using quick- release pin (13). (5) Connect Points 5 and 6: Attach opposite ends of struts (11 and 12) to eyebolts on cross strut (14) at Connect Points 5 and 6 using quick-release pins (15 and 16). (6) Connect Point 10: Install outboard boom weldment (17) on outboard boom weldment (7) Secure by closing Kamlock ears over connection.  Do not install clamp (18) over ears at this time. (7) Connect Point 7: Attach struts (19 and 20) to outboard boom weldment (17) at Connect Point 7 using quick- release pin (21). (8) Connect Points 8 and 9: While supporting end of weldment (17), connect cross strut (14) to struts (1, 2, 19, and 20) at Connect Points 8 and 9 using quick-release pins (22 and 23). (9) Connect Point 11: Install boom extension (24) on end of boom weldment (17) and secure by closing Kamlock ears over connection. 2-18

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing