Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page  Title: Table 2-4. Operator Level PMCS (Cont)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Table 2-4.  Operator Level PMCS (Cont).
Up
TM-5-3740-218-13P Pesticide Dispersal Unit Multicapabilty Helicopter Slung (PDU) Manual
Next
Table 2-4.  Operator Level PMCS (Cont)

TM 5-3740-218-13&P Table 2-4.  Operator Level PMCS (Cont) NOTE:  Within designated interval, these checks are to be performed in the order listed. B-Before D-During A-After B D A Sling Hook Check for tightness of hardware Essential hardware Assembly inside and outside of bucket. missing. Check hook for ease of swivel action; if swivel action is not smooth, lubricate. Wiring Check wiring harness for cut or Insulation or wires Harness torn insulation, frayed or broken damaged. wires.  Check harness mounting clamps for security. Sight Gages Check sight gages for damage Damaged or missing. and security. 7 Lifting Inspect for frays and cuts or Strap frayed, cut, or Strap signs of weakness. missing. 8 Hand Check connections and Damaged, or not Control quick-release coupling for proper operating properly. Harness fit and operation.  Check safety Safety cable damaged cable for damage and security. or missing. 9 Primary Check for leaks.  Check hydraulic Leaks exceed Class II. and lines for proper routing. Secondary Hydraulic Manifolds Pressure Check gage pressure (should read Pressure not Gage 900-1200 psi); adjust if necessary. attainable. (Primary Manifold) Pressure Check gage pressure (should read Pressure not Gage 300 psi in all modes); adjust if attainable. (Secondary necessary. Manifold) 10 Liquid Check all L-clamps for tightness. Leaks exceed Class II. System Check for cracked or broken ears Pump and on mounting plates.  Check for Crosstube leaks anywhere in system. Assembly 2-11 INTERVAL ITEM NO. Item To Be Inspected EQUIPMENT IS NOT READY/AVAILABLE IF: Procedures

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing