Click here to make tpub.com your Home Page

Page Title: Table 4-1. Organizational Preventive Maintenance Checks and Services (Continued)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Table 4-1. Organizational Preventive Maintenance Checks and Services (Continued)
Up
TM-5-3740-214-14 Aerosol Generator Non-Thermal Insecticide Unltra-Low Volume Model XKA (NSN 374001-076-1341) Manual
Next
Table 4-1. Organizational Preventive Maintenance Checks and Services (Continued)

TM 5-3740-214-14
Table 4-1. Organizational Preventive Maintenance Checks and Services (Continued)
M = Monthly
A/R = As Required
Q = Quarterly
H = Hourly
INTERVAL
ITEM
ITEM TO BE INSPECTED
NO.  M A/R
Q
H
PROCEDURE
COMPRESSOR ASSEMBLY (Continued)
Figure 4-11. Compressor Assembly
c. Replace belts.
(1) Loosen mounting nuts. Do not remove them.
(2) Turn tensioner nut counterclockwise (left) to loosen belts.
(3) Replace belts.
NOTE
Replace belts as a set. DO NOT replace only one belt at a time.
d. Line up pulleys.
NOTE
Compressor mounting nuts should be loose and belt guard removed.  An
alignment gage can be made from a piece of scrap metal or wood and be used
to line up the pulleys.
4-10

Privacy Statement - Press Release - Copyright Information. - Contact Us