Page  Title: TESTING OPERATING VOLTAGES AND COMPENSATING FOR CONDUIT WIRE VOLTAGE DROPS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
INSTALLING WIRES FOR ALARM AND CONTROL DEVICES, ALL MODELS
Up
TM-10-6665-297-13P Bacharach Combustibles Gas Alarm System NSN 6665-00-410-4982 Manual
Next
Figure 2-19.  Detector Model 800-086 Exploded View

TM 10-6665-297-13&P 2-6 DETECTOR INSTALLATION  (continued) 2-6.8 Connecting Conduit Wires from Detector to Control Module Assembly Terminals   (continued) 1. Connect  red  or  green  conduit  wires  to  terminal  post  marked  DET  1,  A  on  terminal  panel  (Model CD80OP:  terminal TB-1, A-1). 2. Connect  black  conduit  wire  to  terminal  post  marked  DET  1,  R  on  terminal  panel  (Model  CD800P: terminal TB-1, R-l). 3. Connect  white  conduit  wire  to  terminal  post  marked  DET  1,  C  on  terminal  panel  (Model  CD800P: terminal TB-1, C-1). If two detectors are to be operated from a single control module, connect red or green, black, and white wires  from  the  second  detector  conduit  to  terminal  posts  DET  2,  A,  R,  and  C  respectively  (Model CD800P:  terminals TB-1, A-2, R-2 and C-2).  Remove factory-installed resistors from terminals DET 2, A and C, and C and R (CD800P:  TB-1, A-2 and C-2, and C-2 and R-2).  Figures 2-11 through 2-15 show connections, all models.) 2-6.9 TESTING OPERATING VOLTAGES AND COMPENSATING FOR CONDUIT WIRE VOLTAGE DROPS.  Special equipment required: 0-10 V range DC Voltmeter,    2% accuracy in 5-6 V range. Test Socket Adapter #0023-4027 (one furnished with each rack assembly) Circuit Card Extender #0023-4023 (except some CDSOOP models which have built-in extenders, and model  CD80OW,  for  which  the  card  extender  is  not  required.    Six-point  rack  assemblies  provide  an extender  in  storage  socket  at  inside  left  in  the  chassis.    Wall-mounting  four  and  eight-point  cabinets have extenders packed inside the cabinet.) Two people are required to test and adjust operating voltage:  one at the control module, and another at the detector.  This test must be conducted for each control/detector unit in turn.  Test detector operating voltage level and compensating for conduit wire voltage drops in accordance with the fol- lowing steps: 1. Make  certain  that  power  is  off  at  control  module  (PILOT  ON/OFF  light  unlit  on  control  module panel). WARNING:  Before opening detector housing, use a portable sniffer to determine that no hazardous gas is present in the vicinity. 2. Remove protecting covers from detector sensor element as follows: 23-9617 7/1/76 2-28