| ||||||||||
|
|
![]() ![]() TM 10-5410-228-10
TABLE OF CONTENTS (Continued)
Page
2.24.2.10
Disabled CBPS System Connected in MTF and/or FST Configuration
in NBC Mode.....................................................................................................
2-96
2.24.2.11
Static Operation With Internal Power - Switchover From Non-NBC To
NBC Conditions ...............................................................................................
2-97
2.24.2.12
Static Operation With External Power - Switchover From Non-NBC To
NBC Conditions ...............................................................................................
2-100
2.24.3
Striking and Shut Down Procedures ..............................................................
2-103
2.24.3.1
CBPS Striking Procedures ..............................................................................
2-103
2.24.3.2
Static Mode Shut Down Procedure - Internal Power ....................................
2-112
2.24.3.3
Static Mode Shut Down Procedure - External (10 kW TQG) Power ............
2-112
2.24.3.4
High Mobility Trailer (HMT) Hookup ............................................................
2-114
2.24.3.5
Moving Chemical Biological Protective Shelter (CBPS) System ..................
2-115
Section IV. Operation Under Unusual Conditions ........................................................................
2-116
2.25
Operating Procedures Under NBC Conditions ..............................................
2-116
2.25.1
Mobile Operation Under NBC Conditions .....................................................
2-116
2.25.1.1
Expanded Capacity Vehicle (ECV) Setup ......................................................
2-116
2.25.1.2
Mobile Operation Switchover From NBC To Non-NBC Conditions ............
2-117
2.25.2
Static Operation Under NBC Conditions .......................................................
2-119
2.25.2.1
Expanded Capacity Vehicle (ECV) and High Mobility Trailer
(HMT) Setup ....................................................................................................
2-119
2.25.2.2
Deployment Using Internal ECV Power ........................................................
2-119
2.25.2.3
Deployment Using External (10 kW TQG) Power .........................................
2-122
2.25.2.4
Air Beam Shelter (ABS) Setup Procedures Under NBC Conditions ............
2-124
2.25.2.5
Direct Complexing Shelter (DCS) Under NBC Conditions ...........................
2-139
2.25.2.6
Static Operation Switchover From NBC To Non-NBC Conditions ..............
2-142
2.25.3
Striking Procedures Under NBC Conditions .................................................
2-144
2.25.3.1
CBPS Striking Procedures ..............................................................................
2-144
2.25.3.2
HMT Hookup ...................................................................................................
2-153
2.25.3.3
Moving Chemical Biological Protective Shelter (CBPS) System ..................
2-154
2.26
Operation In Heavy Snow ...............................................................................
2-155
2.27
Operation In High Winds ................................................................................
2-155
2.28
Operation In Wet Climate ...............................................................................
2-157
2.29
Operation In Extreme Cold .............................................................................
2-157
2.30
Operation In Extreme Heat ............................................................................
2-157
2.31
Operation At Different Altitudes.....................................................................
2-158
2.32
ABS Insulation Panels Removal/Installation ................................................
2-158
2.33
Operation With Failed Air Beam ...................................................................
2-160
2.34
Nuclear, Biological and Chemical (NBC) Decontamination .........................
2-160
Section I. DESCRIPTION AND USE OF OPERATOR'S
CONTROLS AND INDICATORS
2.1
GENERAL.
This section identifies and describes controls and indicators which operator will use to support Chemical
Biological Protective Shelter (CBPS) System. Refer to referenced manuals in Appendix A for auxiliary
components (e.g., 10 kW Tactical Quiet Generator [TQG] and Expanded Capacity Vehicle [ECV]).
2-2
Change 1
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |