Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page  Title: Materials Control
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Frequency of Process Control Checks
Up
TM-1-1500-335-23 Nondestructive Inspection Methods Manual
Next
Hydrophilic Remover (Pre-RINSE).

T.O. 33B-1-1 1-23 1.5.2.1.1 Many of the listed steps are fundamental to the respective inspection processes.  Therefore, an inspector can perform a self-audit by referencing the appropriate steps each time the respective processes are performed. 1.5.2.2 Cleaning / Precleaning. Prior to application of penetrant, examine the precleaned parts using either visual or locally developed technique for the following: a.     Complete removal of coatings, soil, and contaminants, with special attention to recess and entrapment areas. b.    Verify that all cleaning process residues have been removed. c.     Verify that the parts are adequately dried, especially in recessed areas and faying surfaces. 1.5.2.3 Materials Control. 1.5.2.3.1 New Materials. Verify that tests on new materials are being properly performed and documented (paragraph 1.5.3). 1.5.2.3.2 In-Use Materials. Verify that tests on in-use materials are being properly performed and documented (paragraph 1.5.5). 1.5.2.4 Penetrant. Observe the application of penetrant paying attention to the following: a.     The part temperatures are not excessive prior to penetrant application. b.    The penetrant application is properly accomplished for the method being used. c.     The entire part surface or area to be inspected is completely and evenly covered. d.     When using the immersion method parts with concave or complex surfaces are rotated in the penetrant to assure no air pockets remain. e.     Drain-dwell is accomplished in a satisfactory manner including the removal of any pooled penetrant. f.      Penetrant dwell time complies with the procedure requirements. 1.5.2.5 Lipophilic Emulsifier. The lipophilic emulsifier process SHALL be observed and checked periodically to verify the following: a.     Method B removability tests, in-process, are being properly performed and documented (see paragraph 1.5.5.3.2). b.    The part is rapidly and completely covered with emulsifier with minimum mechanical action and no air pockets or uncoated surfaces. c.     Drain-dwell is accomplished in a satisfactory manner, including rotation of parts to avoid pooling when required. d.     Emulsifier dwell is closely timed and complies with procedure requirements. e.     No delay in moving part from emulsifier dwell station into the rinse station.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing