Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page  Title: Frequency of Process Control Checks
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Causes of Materials Degradation
Up
TM-1-1500-335-23 Nondestructive Inspection Methods Manual
Next
Materials Control

T.O. 33B-1-1 1.5.1.5 Frequency of Process Control Checks. 1.5.1.5.1 Guidelines. NOTE Table 1-3 establishes MAXIMUM process control intervals allowed.  Laborato- ries  shall  use  the  guidelines  listed  below  to  establish  their  process  control requirements and intervals. One of the factors inf luencing the degradation of a penetrant process (materials, equipment and procedures) is the volume of parts being processed.  The opportunities for materials contamination, drag-out, equipment malfunction, and procedure deviation are directly proportional to the number of parts being inspected.  Since there is no uniformity in workload between activities, a single calendar schedule cannot be established.  Each activity  SHALL  set  inspection  intervals  based  on  their  workloads.    The  inspection  intervals  SHALL  be documented as shown in Chapter 1, page 1-15, paragraph 1.4.5.  Guidance on inspection intervals is provided in the following paragraphs. a. A high volume workload is considered to be a penetrant system that is in continuous use or is utilized for more than 4 hours every workday.  A suggested inspection interval for materials verification of high volume penetrant systems is a daily check. b. A medium volume workload is considered to be a penetrant system that is used daily for less than 4 hours.    A  weekly  inspection  interval  is  suggested  for  materials  verification  of  penetrant  systems processing a medium volume workload. c. A low volume workload is considered to be a penetrant system that is used to process parts less than 3 days a week.  An inspection interval of once every two weeks is suggested for materials verification of low volume workload penetrant systems. d. In  a  penetrant  system  used  occasionally  with  a  one-week  interval  between  uses,  the  minimum monthly verification requirement must apply. 1.5.1.5.2 Specific Requirements. Equipment  and  process  control  inspection  intervals  vary  depending  upon  the  specific  item  to  be  checked. Many items will degrade on a time rather than a use basis.  Equipment and process SHALL be inspected at weekly, monthly, quarterly or semiannual intervals as specified in ASTM 1417 or other applicable process specification. 1.5.2 Process Control Requirements. 1.5.2.1 General. The  capability  and  reliability  of  penetrant  inspections  depend  upon  the  materials,  equipment,  and  proce- dures.    Degradation  in  any  of  the  three  areas  will  reduce  the  effectiveness  of  the  process.    The  following paragraphs highlight some process steps requiring audit.  At minimum these steps should be audited, and additional applicable steps should be added to cover specific equipment or processes as necessary. 1-22 Change 2