Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: CHAPTER 1 INTRODUCTION
Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Up
TM-9-2350-261-10 Recovery Vehicle Full Tracked: Medium M88A1 NSN 2350-00-122-6826 Winch Power Takeoff and Hoist System Manual
Next
DESTRUCTION  OF  ARMY  MATERIEL  TO  PREVENT  ENEMY

TM 9-2350-261-10 CHAPTER  1 INTRODUCTION Section  I.  GENERAL  INFORMATION SCOPE This manual tells how to operate and maintain the following carriers: l M113A2 Full Tracked Armored Personnel Carrier l M577A2  Light  Tracked  Command  Post  Carrier l M106A2 Self-propelled 107-mm Mortar Carrier l M125A2 Self-propelled 81-mm Mortar Carrier l M1064 Self-propelled 120-mm Mortar Carrier l M1059 Full Tracked Smoke Generator Carrier l M1068  Standardized  Integrated  Command  Post  System NOTE The  operation  of  the  107-mm,  4.2  inch  Mortar, M30  used  on  the  M106A2  Carrier  is  covered  in TM  9-1015-215-10.  The  operation  of  the  81-mm Mortar,  M29A1  used  on  the  M125A2  Carrier  is covered  in  TM  9-1015-200-10.  The  operation  of the  120-mm  Mortar,  used  on  the  Ml064  Carrier is  covered  in  TM  9-1015-250-10. MAINTENANCE  FORMS,  RECORDS  AND  REPORTS Department of the Army forms and procedure6 used for equipment maintenance will  be  those  prescribed  by  DA  Pamphlet  738-750,  The  Army  Maintenance Management System6 (TAMMS). REPORTING  OF  EQUIPMENT  IMPROVEMENT RECOMMENDATIONS   (EIR) EIR  can  and  must  be  submitted  by  anyone  who  is  aware  of  an  unsatisfactory condition with the equipment design or use. It is not necessary to show design or list a better way to perform a procedure, just simply tell why the design is unfavorable or why a procedure is difficult. EIR maybe submitted on SF 368 (Quality Deficiency Report). Mail directly to Commander, U.S. ARMY Tank-automotive and Arma- ment  Command,  Attn:  AMSTA-TR-QCL,  Warren,  ML,  48397-5000. Change     5     1-1

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing