|
| |
TM-5-5420-208-12P0001.gif TM-5-5420-208-12P0002.gif TM-5-5420-208-12P0003.gif TM-5-5420-208-12P0004.gif TM-5-5420-208-12P0005.gif
Tm-5-5420-209-12
-
Chapter 1 Introduction
-
Hand Receipt (Hr) Manuals.
-
Transporter
-
Figure 1-4. Ramp Bay, Ramp End.
-
Location And Description Of Major Components
-
Interior Bay.
-
Ramp Bay
-
Equipment Data
-
Equipment Data (Cont)
-
Section Iii. Technical Principles Of Operation
-
Chapter 2 Operating Instructions
-
Figure 2-1. Operator’s Controls And Indicators Interior Bay (Folded).
-
Table 2-1. Interior Bay Controls And Indicators Lnterior Bay (Folded).
-
Figure 2-2. Operator’s Controls And Lndicators Interior Bay Operator
(Unfolded)
-
Table 2-2. Interior Bay Controls And Indicators (Unfolded)
-
Figure 2-3. Operator’s Controls And Indicators Ramp Bay (Folded).
-
Table 2-3. Ramp Bay Controls And Indicators (Folded).
-
Figure 2-4. Ramp Bay Operator’s Controls (Unfolded).
-
Table 2-4. Ramp Bay Controls And Indicators (Unfolded).
-
Figure 2-5. Operator Controls And Indicators Hydraulic Control Console
-
Table 2-5. Hydraulic Control Console Controls And Indicators.
-
Figure 2-6. Operator Controls And Indicators Transporter.
-
Table 2-6. Transporter Operator Controls And Indicators
-
Table 2-7. Power Takeoff (Pto) Control Lever (Model 2280)
-
Figure 2-8. Power Takeoff (Pto) Control Lever (Model Rbt).
-
Figure 2-9. Operator's Controls And Indicators, Tools.
-
Table 2-9. Operator Tools.
-
Reporting Deficiencies.
-
Painting.
-
Table 2-10. Operator Preventive Maintenance Checks And Services (Pmcs) For The
Transporter.
-
Cab Protector
-
Splash Guards
-
Cradle Clamp
-
Walkway (Front)
-
Boom Sheave
-
Winch (Rear)
-
Table 2-11. Operator Preventive Maintenance Checks And Services (Pmcs) For The
Ramp Bay.
-
Tagline Bar
-
Bridge Latch
-
Bridge Latch
-
Bilge Plug
-
Tagline Bar
-
Tagline Bar
-
Approach Ramps
-
Table 2-12. Operator Preventive Maintenance Checks And Services (Pmcs) For The
Interior Bay
-
Bridge Latch
-
Foldlock Latch
-
Foldlock Latch
-
Skin Surface
-
Bilge Plugs
-
Bilge Plugs
-
Deck Surface
-
Section Iii. Operation Under Usual Conditions
-
Figure 2-10. Bridge Assembly Site Layout For Single Launch Site (Successive
Bay Assembly)
-
Figure 2-11. Bridge Assembly Site Layout For Multilaunch Site (Successive Bay
Assembly)
-
Figure 2-12. Bridge Assembly Site Layout For Multilaunch Site (Swinging Bridge
Assembly)
-
Figure 2-13. Raft Assembly Layout.
-
Table 2-13. Bridge Assembly Requirements.
-
Bay Free Launch.
-
Figure 2-14. Bay Free Launch (Sheet 1 Of 5).
-
Figure 2-14. Bay Free Launch (Sheet 2 Of 5).
-
Bay Free Launch. (Cont)
-
Figure 2-14. Bay Free Launch (Sheet 3 Of 5).
-
Figure 2-14 Bay Free Launch (Sheet 4 Of 5)
-
Figure 2-14. Bay Free Launch (Sheet 5 Of 5)
-
Figure 2-15. Bay Controlled Launch (Sheet 1 Of 6).
-
Figure 2-15. Bay Controlled Launch (Sheet 2 Of 6)
-
Controlled Bunch Of Bay.
-
Figure 2-15. Bay Controlled Launch (Sheet 3 Of 6).
-
V
-
Figure 2-15. Bay Controlled Launch (Sheet 5 Of 6).
-
Figure 2-15. Bay Controlled Launch (Sheet 6 Of 6).
-
Figure 2-16. High Bank Launch Of Bay (Sheet 1 Of 12).
-
Figure 2-16. High Bank Launch Of Bay (Sheet 2 Of 12).
-
Figure 2-16. High Bank Launch Of Bay (Sheet 3 Of 12).
-
Figure 2-16. High Bank Launch Of Bay (Sheet 4 Of 12).
-
Figure 2-16. High Bank Launch Of Bay (Sheet 5 Of 12).
-
Figure 2-16. High Bank Launch Of Bay (Sheet 6 Of 12).
-
Figure 2-16. High Bank Launch Of Bay (Sheet 7 Of 12).
-
Figure 2-16. High Bank Launch Of Bay (Sheet 8 Of 12).
-
Figure 2-16. High Bank Launch Of Bay( Sheet 9 Of 12).
-
V
-
Figure 2-16. High Bank Launch Of Bay (Sheet 11 Of 12).
-
Deployment By Helicopter.
-
Figure 2-17. Deployment By Helicopter (Sheet 1 Of 3)
-
Figure 2-17. Deployment By Helicopter (Sheet 2 Of 3)
-
Figure 2-17. Deployment By Helicopter (Sheet 3 Of 3).
-
Figure 2-18. Ramp Bay To Interior Bay Connection (Sheet 1 Of 2)
-
Figure 2-18. Ramp Bay To Interior Bay Connection (Sheet 2 Of 2).
-
Figure 2-19. Ramp Bay To Interior Bay Connection (Alternate Method)
-
Interior Bay To Interior Bay Connection
-
Figure 2-20. Interior Bay To Interior Bay Connection.
-
Figure 2-21. Bridge Assembly Successive Bay Method (Sheet 1 Of 4).
-
Figure 2-21. Bridge Assembly Successive Bay Method (Sheet 2 Of 4).
-
Table 2-14. Bridge Boats Required For Anchorage.
-
Bridge Assembly Swinging Bridge Method
-
Figure 2-22. Bridge Assembly Swinging Bridge Method (Sheet 1 Of 3)
-
Figure 2-22. Bridge Assembly Swinging Bridge Method (Sheet 2 Of 3)
-
Bridge Anchorage.
-
Fixedanchorage.
-
Figure 2-24. Typical Configuration Bridge Boat Anchoring
-
End Span Anchorage.
-
Table 2-16. Ribbon Bridge Capacities
-
Operation Of Auxiliary Equipment.
-
Figure 2-26. Bilge Pump Operation
-
Figure 2-27. Pressure Pump Operation
-
Bridge Recovery
-
Figure 2-28. Bridge Recovery Successive Bay Method (Sheet 2 Of 2).
-
Disassembly Swinging Bridge Method
-
Figure 2-29. Bridge Recovery Swinging Bridge Method (Sheet 2 Of 3).
-
Figure 2-29. Bridge Recovery Swinging Bridge Method (Sheet 3 Of 3).
-
Figure 2-30. Bay Water Recovery (Sheet 1 Of 5)
-
Figure 2-30. Bay Water Recover (Sheet 2 Of 5)
-
Figure 2-30. Bay Water Recovery (Sheet 3 Of 5)
-
Bay Recovery (Cont)
-
Figure 2-30. Bay Water Recovery (Sheet 4 Of 5)
-
Figure 2-30. Bay Water Recovery (Sheet 5 Of 5).
-
Ground Recovery
-
Figure 2-31. Bay Ground Recovery (Sheet 1 Of 4)
-
Figure 2-31. Bay Ground Recovery (Sheet 2 Of 4).
-
Figure 2-31. Bay Ground Recovery (Sheet 3 Of 4)
-
Figure 2-31. Bay Ground Recovery (Sheet 4 Of 4)
-
Recovery By Helicopter
-
Figure 2-32. Bay Helicopter Recovery (Sheet 1 Of 3)
-
Figure 2-32. Bay Helicopter Recovery (Sheet 3 Of 3).
-
Raft Assembly
-
Figure 2-34. Longitudinal Rafting Procedures (Sheet 1 Of 6).
-
Figure 2-34. Longitudinal Rafting Procedures (Sheet 2 Of 6).
-
Figure 2-34. Longitudinal Rafting Procedures (Sheet 3 Of 6).
-
Raft Assembly (Cont)
-
Figure 2-34. Longitudinal Rafting Procedures (Sheet 4 Of 6)
-
Figure 2-34. Longitudinal Rafting Procedures (Sheet 5 Of 6)
-
Table 2-17. Longitudinal Railing Capacities
-
Figure 2-34. Longitudinal Rafting Procedures (Sheet 6 Of 6).
-
Figure 2-35. Conventional Rafting Procedures (Sheet 1 Of 4).
-
Figure 2-35. Conventional Rafting Procedures (Sheet 2 Of 4).
-
Figure 2-35. Conventional Rafting Procedures (Sheet 3 Of 4)
-
Figure 2-35. Conventional Rafting Procedures ( Sheet 4 Of 4)
-
Able 2-18. Conventional Rafting Capacities.
-
Operation Of Bridge In Rainy Conditions
-
Chapter 3 Operator’s Maintenance Instructions
-
Troubleshooting Procedures
-
Clearance And Marker Lights Inoperative
-
Winch Develops Insufficient Power To Retrieve Bay/Or Lift Bay For Bank Launch
-
Locking Cylinder Inoperative
-
Section Iii. Operator Maintenance Procedures
-
Figure 3-1. Mirror.
-
Bracket Assembly Left And Right Hand.
-
Figure 3-2. Bracket Assembly
-
Wheel Splash Guards Right And Left Hand
-
Bay Latch Pin And Rope Assembly
-
Roller And Axle Assembly
-
Figure 3-5. Roller And Axle Assembly
-
Rear Winch Assembly And Motor
-
Figure 3-6. Rear Winch Assembly And Motor Model 11-S-El.
-
Rear Winch Assembly And Motor.
-
Figure 3-7. Rear Winch Assemnbly And Motor Pg 115-043r
-
Rear Winch Cable Assembly
-
Figure 3-8. Winch Cable
-
Cable Tensioner Assembly
-
Figure 3-9. Cable Tensioner Assembly
-
Boom Assembly
-
Figure 3-10. Boom Assembly
-
Sheave And Pin.
-
Figure 3-11. Sheave And Pin
-
Snatch Block Anchor And Pin
-
Figure 3-12. Snatch Block Anchor.
-
Rollers And Pins
-
Figure 3-13. Bay Roller And Pin.
-
Service Winch Cable Roller
-
Figure 3-14. Winch Cable Roller Pin, Service
-
Aft Tiedown Hook
-
Figure 3-15. Aft Tiedown Hook, Service
-
Pins And Clevis
-
Figure 3-16. Pins And Clevis, Service
-
Pin And Arm
-
V
-
Hydraulic Filter Assembly.
-
Figure 3-18. Hydraulic Filter Assembly Service
-
Drive Shaft Gear Pump
-
Figure 3-19. Drive Shaft Gear Pump, Service
-
Cable Assembly, Ramp Bay
-
Figure 3-20. Cable Assembly Service.
-
Hinge Pins, Link And Hardware, Ramp Bay
-
Figure 3-21. Hinge Pins, Link And Hardware, Service
-
Connecting Pin Trunions And Lever, Ramp Bay
-
Figure 3-22. Connecting Pin Trunnions And Lever, Service
-
Cable Assembly, Interior Bay
-
Figure 3-23. Cable Assembly Service
-
Connecting Pin Trunions And Lever, Interior Bay
-
Figure 3-24. Connecting Pin Trunnions And Lever, Service.
-
Hinge Pins, Link And Hardware Interior Bay
-
Figure 3-25. Hinge Pins, Link And Hardware, Service
-
Chapter 4 Unit Maintenance
-
Section Ii. Service Upon Receipt
-
Reporting Deficiencies
-
Painting
-
Hydraulic Filter Assembly
-
Tie Down Hook Assembly
-
Floodlight Master Switch
-
Light, Marker And Reflector
-
Light, Marker And Reflector
-
Cab Protector Bracket
-
Boom Cylinders
-
Table 4-2. Unit Preventive Maintenance Checks And Services (Pmcs) For The Ramp
Bay
-
Skin Surface
-
Travel Latch
-
Hydraulic Line
-
Lifting Eye (Rear)
-
Hydraulic Pumps
-
Unfolding Mechanism
-
Skin Surface
-
Bridge Latch
-
Tie Down Pin
-
Bridge Latch
-
Lower Lock Drive
-
Deck Surface
-
Roadway
-
Section Iv. Unit Troubleshooting
-
Table 4-4. Unit Troubleshooting
-
Boom Inoperative
-
Winch Does Not Operate
-
Cable Tensioner Inoperative, (Model Rbt)
-
Locking Cylinder Inoperative
-
Pressure Indicator In Tripped (Up) Position
-
Bay Does Not Open Properly
-
Section V. Unit Maintenance
-
Section V. Unit Maintenance (Cont)
-
General
-
Figure 4-1. Floodlights, Replace.
-
Floodlights
-
Figure 4-2. Floodlight, Repair
-
Floodlight Switch
-
Figure 4-3. Floodlight Switch, Replace
-
Floodlight Electrical Leads And Clamps
-
Figure 4-4. Floodlight Electrical Leads And Clamps, Replace
-
Repair
-
Figure 4-5. Floodlight Electrical Leads And Clamps, Repair
-
Clearance And Marker Lights
-
Figure 4-6. Clearance And Marker Lights, Removal, Repair And Installation
-
Clearance And Marker Lights Electrical Leads And Clamps
-
Figure 4-7. Clearance And Marker Lights Electrical Leads And Clamps,
Replacement.
-
Repair
-
Figure 4-8. Clearance And Marker Lights Electrical Leads And Clamps, Repair
-
Reflectors
-
Figure 4-9. Reflectors, Replace
-
Throttle Control
-
Figure 4-10. Thrvttle Control, Replace
-
Mirror And Bracket Assemblies
-
Figure 4-11. Mirror And Bracket Assemblies, Repair
-
Bay Latch Pin And Rope Assembly
-
Figure 4-12. Bay Latch Pin And Rope Assembly, Repair.
-
Walkways
-
Figure 4-13. Walkways, Replace
-
Repair
-
Figure 4-14. Walkways, Repair
-
Tire Carrier Assembly
-
Figure 4-15. Tire Carrier Assembly, Removal
-
Repair
-
Figure 4-16. Tire Carrier, Repair
-
Installation.
-
Figure 4-17. Tire Carrier Assembly, Installation
-
Roller And Axle Assembly
-
Figure 4-18. Roller And Axle Assembly (Front), Replace
-
Replace(Rear)
-
Figure 4-19. Roller And Axle Assembly (Rear), Replace
-
Rear Winch Assembly.
-
Figure 4-20. Winch Assembly, Removal.
-
Disasembly
-
Figure 4-21. Winch Assembly Model 11-S-Ec, Disassembly (Sheet 1 Of 3)
-
Disaasembly (Cont)
-
Figure 4-21. Winch Assembly Model 11-S-Ec, Disassembly (Sheet 2 Of 3).
-
Disaasembly (Cont)
-
Figure 4-21. Winch Assembly Model 11-S-Ec, Disassembly (Sheet 3 Of 3)
-
Repair
-
Figure 4-22. Winch Assembly Model 11-S-Ec, Reassembly (Sheet 1 Of 10)
-
Reassembly (Cont)
-
Figure 4-22. Winch Assembly Model 11-S-Ec, Reassembly (Sheet 2 Of 10)
-
Reassembly (Cont)
-
Figure 4-22. Winch Assembly Model 11-S-Ec, Reassembly (Sheet 3 Of 10).
-
Reassembly (Cont)
-
Figure 4-22. Winch Assembly Model 11-S-Ec, Reassembly (Sheet 4 Of 10)
-
Reassembly (Cont)
-
Figure 4-22. Winch Assembly Model 11-S-Ec, Reassembly (Sheet 6 Of 10).
-
Reassembly (Cont)
-
Figure 4-22. Winch Assembly Model 11-S-Ec, Reassembly (Sheet 8 Of 10).
-
Reassembly (Cont)
-
Figure 4-22. Winch Assembly Model 11-S-Ec, Reassembly (Sheet 10 Of 10).
-
Disassembly
-
Figure 4-23. Winch Assembly Model Pg-115-043r, Disassembly (Sheet 1 Of 5)
-
Disassembly (Cont)
-
Figure 4-23. Winch Assembly Model Pg-115-043r, Disassembly (Sheet 2 Of 5)
-
Disassembly (Cont)
-
Figure 4-23. Winch Assembly Model Pg-115-043r, Disassembly (Sheet 3 Of 5)
-
Disassembly (Cont)
-
Figure 4-23. Winch Assembly Model Pg-115-043r, Disassembly (Sheet 5 Of 5)
-
Repair
-
Figure 4-24. Winch Assembly Model Pg-115-043r, Reassembly (Sheet 1 Of 7)
-
Repair (Cont)
-
Figure 4-24. Winch Assembly Model Pg-115-043r, Reassembly (Sheet 3 Of 7).
-
Repair (Cont)
-
Figure 4-24. Winch Assembly Model Pg-115-043r, Reassembly (Sheet 5 Of 7)
-
Repair (Cont)
-
Figure 4-24. Winch Assembly Model Pg-115-043r, Reassembly (Sheet 6 Of 7)
-
Repair (Cont)
-
Figure 4-24. Winch Assembly Model Pg-115-043r, Reassembly (Sheet 7 Of 7).
-
Installation.
-
Figure 4-25. Winch Assembly Installation.
-
Winch Motor Assembly (Used On Winch Model 11-S-Ec)
-
Figure 4-26. Winch Motor, Removal.
-
Disassembly
-
Figure 4-27. Winch Motor, Disassembly
-
Repair.
-
Figure 4-28. Winch Motor, Reassembly (Sheet 1 Of 2)
-
Reassembly.
-
Figure 4-28 Winch Motor, Reassembly (Sheet 2 Of 2).
-
Installation.
-
Figure 4-29. Winch Motor, Installation.
-
Winch Motor Assembly (Used On Winch Model Pg-115-043r)
-
Figure 4-30. Winch Motor, Removal.
-
Disassembly.
-
Figure 4-31. Winch Motor, Disassembly.
-
Repair.
-
Figure 4-32. Winch Motor, Reassembly.
-
Installation.
-
Figure 4-33. Winch Motor, Installation.
-
Rear Winch Cable Assembly
-
Figure 4-34. Winch Cable Assembly (Winch Model 11-S-Ec), Replace.
-
Replace Winch Model
-
Figure 4-35. Winch Cable Assembly (Winch Model Pg-115-043r), Replace.
-
Cable Tensioner Assembly (Rbt Model Only)
-
Figure 4-36. Cable Tensioner Adjust.
-
Replace.
-
Figure 4-37. Cable Tensioner Assembly, Replace.
-
Boom Assembly.
-
Figure 4-38. Boom Assembly Replace.
-
Sheave And Pin
-
Figure 4-39. Sheave And Pin, Replace.
-
Guide Sheave, Pin, And Mounting Bracket (Transporter Model Rbt).
-
Figure 4-40. Guide Sheave, Pin, And Mounting Bracket, Replace.
-
Snatch Block Anchor And Pin
-
Figure 4-41. Snatch Block And Anchor Pin, Replace.
-
Rollers And Pins
-
Figure 4-42. Rollers And Pins, Replace.
-
Tiedown Hook And Attaching Hardware.
-
Figure 4-43. Tiedown Hook And Attaching Hardware, Replace
-
Repair.
-
Figure 4-44. Tiedown Hook And Attaching Hardware, Repair.
-
Pins And Clevis.
-
Figure 4-45. Pins And Clevis, Replace.
-
Cylinder Assembly
-
Figure 4-46. Cylinder Assembly, Replace.
-
Pins And Arm
-
Figure 4-47. Pins And Arm, Replace.
-
Cylinder Assembly
-
Figure 4-48. Cylinder Assembly, Replace.
-
Control Valve Assembly
-
Figure 4-49. Control Valve Assembly, Replace
-
Selector Valve.
-
Figure 4-50. Selector Valve, Replace
-
Dual Over Center Valve
-
Figure 4-51. Dual Over Center Valve Cylinder And Valve Port 2 Section, Test.
-
Test.
-
Figure 4-52. Dual Over Center Valve Cylinder And Valve Port 1 Section, Test.
-
Adjust.
-
Figure 4-54. Dual Over Center Valve Cylinder 2 Relief Valve, Adjust.
-
Replace.
-
Figure 4-55. Dual Over Center Valve, Replace.
-
Single Over Center Valve
-
Figure 4-56. Single Over Center Valve, Test
-
Adjust.
-
Figure 4-57. Single Over Center Valve, Adjust.
-
Replace.
-
Figure 4-58. Single Over Center Valve, Replacement.
-
Cable Tensioner Valve (Transporter Model Rbt).
-
Figure 4-59. Cable Tensioner Valve, Valve B, Test.
-
Test.
-
Figure 4-60. Cable Tensioner Valve, Valve A, Test.
-
Adjust.
-
Figure 4-62. Cable Tensioner Valve Valve A, Adjust
-
Replace.
-
Figure 4-63. Cable Tensioner Valve, Replace.
-
Hydraulic Filter Assembly.
-
Figure 4-64. Hydraulic Filter Assembly Replace.
-
Hydraulic Reservoir Assembly
-
Figure 4-65. Hydraulic Reservoir, Service.
-
Replace.
-
Figure 4-66. Hydraulic Reservoir Assembly Replace.
-
Repair.
-
Figure 4-67. Hydraulic Reservoir Assembly Repair.
-
Reservoir Bracket
-
Figure 4-68. Reservoir Bracket, Replace.
-
Hydraulic System Pump And Bracket
-
Figure 4-69. Hydraulic Pump, Test.
-
Replace.
-
Figure 4-70. Hydraulic Pump, Replace.
-
Drive Shaft Gear Pump
-
Figure 4-71. Drive Shaft Gear Pump, Replace.
-
Repair.
-
Figure 4-72. Drive Shaft Gear Pump, Repair.
-
Power Takeoff Control Lever And Linkage
-
Figure 4-73. Pto Control Lever And Linkage, Replace.
-
Repair.
-
Figure 4-74. Pto Control Lever And Linkage.
-
Hydraulic System Lines And Fittings
-
Figure 4-75. Hydraulic System Lines And Fittings, Transporter Model 2280.
-
Replace.
-
Figure 4-76. Hydraulic System Lines And Fittings, Transporter Model Rbt.
-
Lines, Clamps, And Fittings
-
Figure 4-77. Lines, Clamps And Fittings, Replace.
-
Mounting Bracket.
-
Figure 4-78. Mounting Bracket, Replace.
-
Bogie Bracket Retainer And Chain.
-
Figure 4-79. Bogie Bracket Retainer And Chain, Replace.
-
Cab Protector
-
Figure 4-80. Cab Protector, Replace.
-
Bogie Lock And Brackets
-
Figure 4-81. Bogie Lock And Brackets, Replace.
-
Front Support.
-
Figure 4-82 Front Support, Replace
-
Center Support.
-
Figure 4-83. Center Support, Replace.
-
Boom Pivot Support.
-
Figure 4-84. Boom Pivot Support, Replace.
-
Data Plates
-
Instruction Plates.
-
Cable Assembly.
-
Figure 4-87. Cable Assembly Adjust.
-
Replace.
-
Figure 4-88. Cable Assembly Replace.
-
Cable Link, Pin And Hardware.
-
Figure 4-89. Cable Link, Pin, And Hardware, Replace.
-
Unfolding Lever.
-
Figure 4-90. Unfolding Lever Replace
-
Wear Cap
-
Figure 4-91. Wear Cap, Replace.
-
Support Link And Hinge Pin
-
Figure 4-92. Hinge Pin, Replace.
-
Bow Pontons.
-
Figure 4-93. Bow Pontons, Replace
-
Repair
-
Figure 4-94. Bow Ponton, Repair
-
Handrail Post.
-
Figure 4-95. Handrail Post, Replace
-
Bilge Plug
-
Figure 4-96. Bilge Plug, Replace.
-
Pins.
-
Figure 4-97. Quick Release Pin, Replace.
-
Latch Receptacle And Strike Catch
-
Figure 4-98. Latch Receptacles, Adjust.
-
Replace.
-
Figure 4-99. Latch Receptacle And Strike Catch, Replace.
-
Roadway Pontons
-
Figure 4-100. Roadway Pontons, Replace.
-
Repair.
-
Figure 4-101. Roadway Ponton, Repair.
-
Roadway Approach Ramps
-
Figure 4-102. Approach Bay, Replace.
-
Rubber Bumper.
-
Figure 4-103. Rubber Bumper Replace
-
Hinge Pins, Link And Hardware.
-
Figure 4-104. Front Hinge Pin, Link And Hardware, Replace.
-
Replace ( Rear).
-
Figure 4-105. Rear Hinge Pin, Replace.
-
Foldlock
-
Figure 4-106. Foldlock, Replace.
-
Tee Latch And Travel Latch
-
Figure 4-107. Tee Latch, Replace.
-
Cable Guide
-
Figure 4-108. Cable Guide, Replace.
-
Receptacles
-
Figure 4-109. Receptacles, Replace.
-
Connector And Hardware.
-
Figure 4-110. Connectors And Hardware, Replace.
-
Connecting Pin, Trunions And Lever.
-
Figure 4-111. Connecting Pin, Trunions And Leverreplace
-
Yokes, Pins, And Washers.
-
Figure 4-112. Yokes, Pins, And Washers, Replace.
-
Hose Assemblies, Connectors, Clamps, Fittings And Rope.
-
Figure 4-113. Hose Assembly Connectors, Clamps, Fittings And Ropep Replace.
-
Hydraulic Cylinder And Piston.
-
Figure 4-114. Hydraulic Cylinder And Piston, Test.
-
Service.
-
Figure 4-115. Hydraulic Cylinder And Piston, Service.
-
Cylinder Retaining Pin And Cover
-
Figure 4-116. Cylinder Retaining Pin And Cover, Replace.
-
Hydraulic Pumps.
-
Figure 4-117. Hydraulic Pumps, Service.
-
Replace.
-
Figure 4-118. Hydraulic Punp, Replace.
-
Pump Access Cover.
-
Figure 4-119. Pump Access Cover, Replace.
-
Cable Assembly
-
Figure 4-120. Cable Assembly, Adjustment.
-
Replace.
-
Flgure 4-121. Cable Assembly, Replace.
-
Cable Link, Pin And Hardware.
-
Figure 4-122. Cable Link, Pin, And Hardware, Replace.
-
Unfolding Lever.
-
Figure 4-123. Unfolding Lever, Replace.
-
Support Link And Hinge Pin
-
Figure 4-124. Hinge Pin, Replace.
-
Bow Pontons
-
Figure 4-125. Bow Pontons, Replace
-
Repair.
-
Figure 4-126. Bow Ponton, Repair.
-
Handrail Post.
-
Figure 4-127. Handrail Post, Replace.
-
Bilge Plug.
-
Figure 4-128. Bilge Plug, Replace.
-
Pins.
-
Figure 4-129. Quick Release Pin, Replace.
-
Latch Receptacle And Strike Catch.
-
Figure 4-130. Latch Receptacles, Adjust.
-
Replace.
-
Figure 4-131. Latch Receptacle And Strike Catch, Replace.
-
Roadway Pontons.
-
Figure 4-132. Roadway Pontons, Replace.
-
Repair.
-
Figure 4-133. Roadway Ponton, Repair.
-
Hinge Pins, Link And Hardware.
-
Figure 4-134. Front Hinge Pin, Link And Hardware, Replace.
-
Replace (Rear)
-
Figure 4-135. Rear Hinge Pin, Replace.
-
Foldlock
-
Figure 4-136. Foldlock, Replace
-
Tee Latch And Travel Latch.
-
Figure 4-137. Tee Latch Replace.
-
Cable Guide.
-
Figure 4-138. Cable Guide, Replace
-
Receptacles.
-
Figure 4-139. Receptacles, Replace.
-
Connectors And Hardware.
-
Figure 4-140. Connectors And Hardware, Replace.
-
Connecting Pin, Trunions, And Lever.
-
Flgure 4-141. Connecting Pin, Trunions, And Levers, Replace.
-
Bumpers
-
Section Vi. Preparation For Shipment Or Storage
-
Appendix A References
-
Appendix A References (Cont)
-
Appendix B Maintenance Allocation Chart
-
Explanation Of Columns In The Mac, Section Ii
-
Explanation Of Columns In The Mac, Section Iii.
-
Section Ii. Maintenance Allocation Chart
-
Section Ii. Maintenance Allocation Chart (Cont)
-
Section Ii. Maintenance Allocation Chart (Cont)
-
Section Ii. Maintenance Allocation Chart (Cont)
-
Section Ii. Maintenance Allocation Chart (Cont)
-
Section Ii. Maintenance Allocation Chart (Cont)
-
Section Ii. Maintenance Allocation Chart (Cont)
-
Section Ii. Maintenance Allocation Chart (Cont)
-
Section Ii. Maintenance Allocation Chart (Cont)
-
Section Ii. Maintenance Allocation Chart (Cont)
-
Section Iii. Tools And Test Equipment Requirements For Improved Float Bridge
(Ribbon Bridge)
-
Appendix C Components Of End Item And Basic Issue Items Lists
-
Section Iii. Basic Issue Items
-
Additional Authorization List
-
Additional Authorization List (Cont)
-
Appendix E Expendable Supplies And Materials List
-
Section Ii. Expendable Supplies And Materials List
-
Section Ii. Expendable Supplies And Materials List (Cont)
-
Section Ii. Expendable Supplies And Materials List (Cont)
-
Appendix F Illustrated List Of Manufactured Items
-
Figure F-1. Wire Assembly
-
Figure F-2. Winch Cable Assembly
-
Figure F-3. Fuel Line.
-
Figure F-4. Fuel Line.
-
Figure F-5
-
Table G-1. Torque Limits.
-
Index
-
Index (Cont)
-
Index (Cont)
-
Index (Cont)
-
Index (Cont)
-
Index (Cont)
-
Index (Cont)
-
Index (Cont)
-
Index (Cont)
-
Index (Cont)
-
Index (Cont)
-
Index (Cont)
-
Index (Cont)
-
The Metric System And Equivalents
|