- OPERATOR'S, UNIT, DIRECT
SUPPORT, AND GENERAL SUPPORT MAINTENANCE BRIDGE, ARMORED-VEHICLE
LAUNCHED: SCISSORING TYPE CLASS 60 & CLASS 70 ALUMINUM, 60 FOOT
SPAN; FOR M48A5 AND M60 LAUNCHER
- OPERATOR'S, UNIT, DIRECT
SUPPORT, AND GENERAL SUPPORT MAINTENANCE BRIDGE, ARMORED-VEHICLE
LAUNCHED is changed as follows
- OPERATOR'S, UNIT, DIRECT
SUPPORT, AND GENERAL SUPPORT MAINTENANCE BRIDGE, ARMORED-VEHICLE
LAUNCHED is changed as follows
- WARNING
- WARNING-continued
- WARNING-continued
- WARNING-continued
- WARNING-continued
- TABLE OF CONTENTS
- TABLE OF CONTENTS - CONT
- HOW TO USE THIS MANUAL
- FORMAT
- CHAPTER 1. INTRODUCTION
- Section II. EQUIPMENT
DESCRIPTION AND DATA
- FIGURE 1-2. Bridge Dimensions
and Weights.
- Equipment Capabilities.
- FIGURE 1-3. Maximum Launching
Slopes.
- LOCATION AND DESCRIPTION OF
MAJOR COMPONENTS.
- FIGURE 1-4. AVLB Hydraulic
System Components.
- FIGURE 1-5. Structural
Components.
- Table 1-1. Major Components (MLC
60)
- FIGURE 1-6. Relationship of
Major Components (MLC60) (Sheet 1 of 2).
- FIGURE 1-6 Relationship of
Major Components (MLC60) (Sheet 2 of 2).
- Table 1-3. Major Components
(MLC 70)
- FIGURE 1-7. Relationship of
Major Components (MLC 70) (Sheet 1 of 2).
- FIGURE 1-7 Relationship of
Major Components (MLC 70) (Sheet 2 of 2).
- EQUIPMENT DATA.
- Load and Use Limitations
- FIGURE 1-7. Maximum Vehicle
Crossing Speeds and Weight Limits for MLC 60.
- CAUTION CROSSING
- SAFETY, CARE AND HANDLING.
- CHAPTER 2. OPERATING
INSTRUCTIONS
- Table 2-1. Use of Controls
and Indicators - CONT
- Section II. PREVENTIVE
MAINTENANCE CHECKS AND SERVICES (PMCS)
- Table 2-2. Preventive
Maintenance Checks and Services (PMCS)
- Table 2-2. Preventive
Maintenance Checks and Services (PMCS)-continued
- Table 2-2. Preventive
Maintenance Checks and Services (PMCS)-continued
- Table 2-2. Preventive
Maintenance Checks and Services (PMCS)-continued
- Table 2-2. Preventive
Maintenance Checks and Services (PMCS)-continued
- Table 2-2. Preventive
Maintenance Checks and Services (PMCS)-continued
- Table 2-2. Preventive
Maintenance Checks and Services (PMCS)-continued
- Table 2-2. Preventive
Maintenance Checks and Services (PMCS)-continued
- Table 2-2. Preventive
Maintenance Checks and Services (PMCS)-continued
- Table 2-2. Preventive
Maintenance Checks and Services (PMCS)-continued
- Table 2-2. Preventive
Maintenance Checks and Services (PMCS)-continued
- NOTES
- FIGURE 2-1 Nomenclature of
Structural Components (MLC 60)
- FIGURE 2-2 Nomenclature of
Structural Components (MLC 70).
- FIGURE 2-3 Details.
- Classifications and
Definitions of Leaks for Operator/Crew PMCS
- Section III. OPERATIONS UNDER
USUAL CONDITIONS
- Schematic Drawing
- Preparation for Assembly.
- Assembly of the Bridge
Separated into Eight Sections.
- Installation of Near Shore
Diaphragm
- Installation of Lateral
Brace.
- Flexible Hydraulic Hose
Connections.
- Installation of Scissor
Cylinder Supports,
- Installation of Center
Section Traverse Braces
- Installation of Far-Shore
Center Sections Flexible Hydraulic Hoses.
- Installation of Locking Pins,
Lubricated Center Section, and Quadrant Hinge Pins.-continued
- Installation of Far-Shore
Center Section Transverse Braces.
- Positioning of Far-Shore Ramp
Sections.
- Installation of Far-Shore
Diaphragm, Lateral, and Transverse Braces-continued
- Installation of Far-Shore
Hydraulic Hoses.
- Installation of Cable Beam.
- Quadrant Struts and Securing
Hardware.
- Attaching Quadrant Struts to
Cable Beam.
- Ramp Sections Flexible
Hydraulic Hose Connections and Brackets.
- Hydraulic Quick-Release
Connectors.
- Equalizer Plate, Scissoring
Cables, and Attaching Hardware.
- Installation of Cable
Retainer.
- Cables, Cable Beam, and
Hardware Connections.
- Assembly of Bridge Separated
at Center Hinges
- DISASSEMBLY OF MLC 60.
- Schematic Drawing
- ASSEMBLY AND PREPARATION FOR
USE OF MLC 70 - CONT
- Assembly of the MLC 70
Bridge.
- Installation of Near Shore
Diaphragm
- Installation of Near Shore
Lateral Brace
- Installation of Cylinder
Beam.
- Installation of Scissor
Cylinder.
- Installation of Near Shore
Second Forward Transverse Brace.
- Installation of Far Shore
Forward Transverse Brace.
- Installation of Far Shore
Rear Transverse Brace
- Installation of Cable Beam.
- Installation of Near-Shore
and Far-Shore Hydraulic Lines.
- Installation of Bridge
Sections, Locking Pins, and Quadrant Hinge Pins-continued
- Installation of Quadrant
- Installation of Quadrant
Struts and Securing Hardware.
- Bridge Sections Flexible
Hydraulic Hose Connections and Brackets.
- Scissor Cylinder Flexible
Hydraulic Connections.
- Equalizer Plate, Scissoring
Cables, and Attaching Hardware-continued
- Installation of Cable
Retainer.
- Cables, Cable Beam, and
Hardware Connections.
- Installation of Flag
Assembly.
- OPERATING PROCEDURES.
- Launching-continued
- Launching-continued
- Launching-continued
- Retrieval by Launcher
- Retrieval by
Launcher-continued
- Retrieval by
Launcher-continued
- Retrieval by
Launcher-continued
- Section IV. OPERATIONS UNDER
UNUSUAL CONDITIONS
- Retrieving on a slope.
- Launching in Wetlands or
Marshy Areas.
- Launching in Wetlands or
Marshy Areas-continued
- Retrieving in Wetlands or
Marshy Areas.
- Recovery/ Retrieval of
Impacted Bridge.
- Recovery/ Retrieval of
Impacted Bridge-continued
- Recovery by Other Than a
Launcher.
- Recovery by Other Than a
Launcher-continued
- Recovery by Other Than a
Launcher-continued
- Recovery by Other Than a
Launcher-continued
- Recovery by Other Than a
Launcher-continued
- Recovery by Other Than a
Launcher-continued
- Recovery by Other Than a
Launcher-continued
- LOADING AND UNLOADING
OPERATIONS.
- Loading/Unloading a Bridge
to/from a Launcher.
- Loading
- Unloading
- Unloading-continued
- Loading/Unloading Scissored
Bridge to/from a Lowbed Semitrailer (M172 or M172A1).
- Loading/Unloading Scissored
Bridge to/from a Lowbed Semitrailer (M172 or M172A1)-continued
- Loading/Unloading Scissored
Bridge to/from a Lowbed Semitrailer (M172 or M172A1)-continued
- Loading/Unloading Scissored
Bridge to/from a Lowbed Semitrailer (M172 or M172A1)-continued
- Unloading
- Loading/Unloading of the
Scissored Bridge to/from a Flatbed Semitrailer (MS71 or MS72).
- Loading/Unloading of the
Scissored Bridge to/from a Flatbed Semitrailer (MS71 or
MS72)-continued
- Loading/Unloading of the
Scissored Bridge to/from a Flatbed Semitrailer (MS71 or
MS72)-continued
- Loading/Unloading of the
Scissored Bridge to/from a Flatbed Semitrailer (MS71 or
MS72)-continued
- Loading/Unloading of the
Scissored Bridge to/from a Flatbed Semitrailer (MS71 or
MS72)-continued
- Loading/Unloading the
Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp.
- Loading/Unloading the
Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp-continued
- Loading/Unloading the
Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp-continued
- Loading/Unloading the
Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp-continued
- Loading/Unloading the
Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp-continued
- Loading/Unloading the
Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp-continued
- Loading/Unloading the
Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp-continued
- Loading/Unloading the
Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp-continued
- Loading/Unloading the
Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp-continued
- Loading/Unloading the
Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp-continued
- Loading/Unloading the
Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp-continued
- Loading/Unloading the
Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp-continued
- Loading/Unloading a Scissored
Bridge to/from a Lowbed or Flatbed Semitrailer using forklifts.
- Loading/Unloading a Scissored
Bridge to/from a Lowbed or Flatbed Semitrailer using
forklifts-continued
- Loading/Unloading a Scissored
Bridge to/from a Lowbed or Flatbed Semitrailer using
forklifts-continued
- Loading/Unloading a Scissored
Bridge to/from a Lowbed or Flatbed Semitrailer using a crane (20 ton
capacity or higher).
- Loading/Unloading a Scissored
Bridge to/from a Lowbed or Flatbed Semitrailer using a crane (20 ton
capacity or higher)-continued
- Loading/Unloading a Scissored
Bridge to/from a Lowbed or Flatbed Semitrailer using a crane (20 ton
capacity or higher)-continued
- Transport of the AVLB system
(Class 60/Class 70 Bridges) for Air, Rail, Sea and Highway Mode of
Transportation.
- Transport of the AVLB system
(Class 60/Class 70 Bridges) for Air, Rail, Sea and Highway Mode of
Transportation-continued
- Transport of the AVLB system
(Class 60/Class 70 Bridges) for Air, Rail, Sea and Highway Mode of
Transportation-continued
- PREPARATION FOR MOVEMENT.
- CHAPTER 3. MAINTENANCE
PROCEDURES
- Section II. REPAIR PARTS;
SPECIAL TOOLS; TEST, MEASUREMENT, AND DIAGNOSTIC EQUIPMENT (TMDE);
AND SUPPORT EQUIPMENT
- TROUBLESHOOTING.
- Table 3-1. Troubleshooting -
CONT
- BRIDGE LIFTS FROM BRIDGE SEAT
SLOWLY, OR STOPS.
- BRIDGE BEGINS TO LOWER, THEN
STOPS.
- BRIDGE WILL NOT LIFT FROM
LAUNCHED POSITION.
- Section V. MAINTENANCE
PROCEDURES
- Table 3-2. Suitable
Replacement Bolts, Nuts, and Washers for Temporary Replacement of
Rivets.
- WELDING PROCEDURES.
- Procedures.
- MAINTENANCE INSTRUCTIONS FOR
MLC60.
- TIE ROD REPLACEMENT
- CABLE BEAM REPLACEMENT (Sheet
1 of 2)
- INSTALLATION
- DECK CURB REPLACEMENT
- END PANEL CURB REPLACEMENT
- RAMP CURB REPLACEMENT
- INSIDE CURB REPLACEMENT
- SCISSORING CABLES AND
ATTACHING HARDWARE REPLACEMENT (Sheet 1 of 3)
- INSTALLATION
- INSTALLATION-continued
- HYDRAULIC CYLINDER
REPLACEMENT (Sheet 1 of 3)
- INSTALLATION
- INSTALLATION-continued
- MISCELLANEOUS HYDRAULIC
CYLINDER COMPONENTS REPLACEMENT (Sheet 1 of 2)
- INSTALLATION
- HYDRAULIC CYLINDER HYDRAULIC
LINES AND FITTINGS REPLACEMENT (Sheet 1 of 3)
- INSTALLATION
- INSTALLATION-continued
- CYLINDER BEAM REPLACEMENT
- FLEXIBLE HYDRAULIC LINES
REPLACEMENT (DIAPHRAGM AND HYDRAULIC CYLINDER) (Sheet 1 of 2)
- INSTALLATION
- RAMP SECTION LATERAL BRACE
(NEAR-SHORE AND/OR FAR-SHORE) REPLACEMENT
- NEAR-SHORE RAMP SECTION
TRANSVERSE BRACE REPLACEMENT
- FAR-SHORE RAMP SECTION
TRANSVERSE BRACE REPLACEMENT
- NEAR-SHORE CENTER SECTION
TRANSVERSE BRACE REPLACEMENT (Sheet 1 of 2)
- INSTALLATION-continued
- FAR-SHORE CENTER SECTION
TRANSVERSE BRACE REPLACEMENT (Sheet 1 of 4)
- Removal-continued
- INSTALLATION
- INSTALLATION-continued
- QUADRANT REPLACEMENT (Sheet 1
of 3)
- INSTALLATION
- INSTALLATION-continued
- NEAR-SHORE RAMP SECTION
REPLACEMENT (Sheet 1 of 2)
- INSTALLATION
- FAR-SHORE RAMP SECTION
REPLACEMENT (Sheet 1 of 2)
- INSTALLATION
- NEAR-SHORE DIAPHRAGM
REPLACEMENT
- FAR-SHORE DIAPHRAGM
REPLACEMENT
- RAMP SECTION DECK EXTRUSION
REPLACEMENT (Sheet 1 of 4)
- REMOVVAL-continued
- INSTALLATION
- INSTALLATION-continued
- RAMP SECTION HARD HYDRAULIC
LINE REPLACEMENT (Sheet 1 of 2)
- INSTALLATION
- RAMP SECTION MISCELLANEOUS
COMPONENTS REPLACEMENT (Sheet 1 of 2)
- INSTALLATION
- NEAR-SHORE CENTER SECTION
REPLACEMENT (Sheet 1 of 4)
- REMOVAL-continued
- INSTALLATION
- INSTALLATION-continued
- FAR-SHORE CENTER SECTION
REPLACEMENT (Sheet 1 of 4)
- REMOVAL-continued
- INSTALLATION
- INSTALLATION-continued
- CENTER SECTION DECK EXTRUSION
REPLACEMENT (Sheet 1 of 3)
- INSTALLATION
- INSTALLATION-continued
- CENTER SECTION HARD HYDRAULIC
PIPING REPLACEMENT (Sheet 1 of 3)
- INSTALLATION
- INSTALLATION-continued
- CENTER SECTION MISCELLANEOUS
COMPONENTS REPLACEMENT (Sheet 1 of 3)
- INSTALLATION
- INSTALLATION-continued
- MAINTENANCE INSTRUCTIONS FOR
MLC70.
- BRIDGE SECTION REPLACEMENT
(MALE AND FEMALE)
- QUADRANT REPLACEMENT
- MISCELLANEOUS COMPONENT
REPLACEMENT (MALE and FEMALE)
- CHAPTER 4. DIRECT SUPPORT AND
GENERAL SUPPORT MAINTENANCE
- MAINTENANCE
INSTRUCTIONS-continued
- Assembly.
- CHAPTER 5. ADMINISTRATIVE
STORAGE OR SHIPMENT
- FIGURE 5-1. Placement of Wear
Protectors and Scissor Cylinder Actuating Arm.
- APPENDIX A. REFERENCES
- APPENDIX B. MAINTENANCE
ALLOCATION CHART
- EXPLANATION OF COLUMNS IN THE
MAC, SECTION II
- EXPLANATION OF COLUMNS IN
TOOL AND TEST EQUIPMENT REQUIREMENTS, SECTION III
- Section II. MAINTENANCE
ALLOCATION CHART FOR ARMORED VEHICLE LAUNCHED BRIDGE
- Section III. TOOL AND TEST
EQUIPMENT REQUIREMENTS
- APPENDIX C. COMPONENTS OF END
ITEM AND BASIC ISSUE ITEMS LISTS
- SECTION II. COMPONENTS OF END
ITEM (MLC 60)
- SECTION II. COMPONENTS OF END
ITEM (MLC 60) - CONT
- SECTION II. COMPONENTS OF END
ITEM (MLC 60) - CONT
- SECTION II. COMPONENTS OF END
ITEM (MLC 60) - CONT
- SECTION II. COMPONENTS OF END
ITEM (MLC 70) - CONT
- SECTION II. COMPONENTS OF END
ITEM (MLC 70) - CONT
- SECTION II. COMPONENTS OF END
ITEM (MLC 70) - CONT
- SECTION II. COMPONENTS OF END
ITEM (MLC 70) - CONT
- SECTION III. BASIC ISSUE
ITEMS LISTS
- APPENDIX D.
EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST
- APPENDIX E. REPLACEMENT PARTS
LIST
- INDEX
- INDEX-continued
- INDEX-continued
- INDEX-continued
- INDEX-continued
- INDEX-continued
- INDEX-continued
- INDEX-continued
- INDEX-continued
- INDEX-continued
- THE METRIC SYSTEM AND
EQUIVALENTS
- Blank Page
- TM-5-5420-203-14
- Blank Page
- Blank Page
- RECOMMENDED CHANGES TO
EQUIPMENT TECHNICAL PUBLICATIONS
- RECOMMENDED CHANGES TO
EQUIPMENT TECHNICAL PUBLICATIONS
- DISTRIBUTION
- Blank Page
- Blank Page
- Blank Page
- RECOMMENDED CHANGES TO
EQUIPMENT TECHNICAL PUBLICATIONS
- Blank Page
- Blank Page
- Blank Page
- Blank Page
- RECOMMENDED CHANGES TO
EQUIPMENT TECHNICAL PUBLICATIONS
- Blank Page
- Distribution
|
|