Click here to make tpub.com your Home Page

Page Title: Charging Batteries - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Charging Batteries - continued
Up
TM-9-6140-200-14 Lead-Acid Storage Batteries Manual
Next
Charging Batteries - continued



TM 9-6140-200-14
b. Charging Procedures (6TLFP) by using charger assign at unit level.
Read battery charger instructions overpacked with charger.
(1) Group batteries according to their OCV as follows for charging:
(Manufacturer Recommended)
Approximate Charging hours
Voltage Readings
(use as Guide Only)*
* Issued charger supplies at least 40 amps for each battery being charged.
18-20 hours
(a) 10.5 to 11.0 voltage
14-16 hours
(b) 11.1 to 11.5 voltage
10-12 hours
(c) 11.6 to 12.0 voltage
6-8 hours
(d) 12.1 to 12.5 voltage
(2) Use one of the following to measure Specific Gravity Optical
battery tester NSN 6630-00-105-1418 or Hydrometer (Float)
(80F/80F) NSN 6630-00-171-5126.
Approximate
Optical Tester
Hydrometer Tester
Charging Hours
Readings
Readings
18-20 hours
(a) 1.110 to 1.140
(a) 1.120 to 1.150
14-16 hours
(b) 1.141 to 1.170
(b) 1.151 to 1.180
10-12 hours
(c) 1.171 to 1.200
(c) 1.181 to 1.210
6-8 hours
(d) 1.201 to 1.235
(d) 1.211 to 1.245
2-4 hours
(e) 1.236 to 1.265
(e) 1.245 to 1.275
3-31


Privacy Statement - Press Release - Copyright Information. - Contact Us